Permit: TC-MDP-0123-00239
Permit Details
Apply Date:
01/09/2023
Applicant:
John Sutton
Description:
SFR LE23006 T22-M0054
Permit Reviews
Permit Number - TC-MDP-0123-00239
Permit Status: Complete
Permit Description: SFR LE23006 T22-M0054
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/06/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00239
Permit Status: Complete
Permit Description: SFR LE23006 T22-M0054
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/28/2023 | Post-Tension Inspection Report is required. |
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00239
Permite Description: SFR LE23006 T22-M0054
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/21/2023 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 4/21/23- missing Anchor Bolts in garage @ front porch, missing hold down on 2x6 exterior garage, need engineer fix for blow out pedestal at rear porch, h25 clips on center bearing wall, too many shiners at roof above stairwell. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00239
Permit Description: SFR LE23006 T22-M0054
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 3/20/2023 | |
03/30/2023 | COT - RSBU - Preslab | Passed | ||
03/30/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/30/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
06/28/2023 | BULD - Electrical Clearance | Passed | ECO TEP | |
07/10/2023 | RSBU - Building Progress | Passed | Mechanical, electrical, and plumbing rough-in is complete on both floors. okay to cover with drywall. | |
07/10/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is installed and electrical panel is connected to it. | |
07/10/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15# of air. | |
07/10/2023 | COT - RSPL - Sewer | Passed | Passed on 3/20/23 by Salvador C. | |
07/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete on both floors. okay to cover with drywall. | |
07/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Passed on 6/14/23 by Robert | |
07/10/2023 | COT - RSPL - Yard Water Line | Passed | Passed on 3/20/23 by Salvador C. | |
07/10/2023 | RSEL - Electrical Progress | Passed | Electrical rough-in is complete on both floors. okay to cover with drywall. | |
07/10/2023 | RSME - Mechanical Progress | Passed | Mechanical rough-in is complete on both floors. okay to cover with drywall. | |
07/10/2023 | RSPL - Plumbing Progress | Passed | Plumbing rough-in is complete on both floors. okay to cover with drywall. | |
07/28/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/25/2023 | COT - BULD - SWG Clearance | Passed | Swg clearance for meter only. | |
11/13/2023 | COT - RSEL - Electrical Final | Passed | ||
11/13/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
11/13/2023 | COT - RSME - Mechanical Final | Passed | ||
11/13/2023 | COT - RSPL - Gas Final | Passed | ||
11/13/2023 | COT - RSPL - Plumbing Final | Passed | ||
11/14/2023 | RSBU - Building Final | Passed |