Permit Details

Status:
In Revision
Type:
Commercial Building
Address:
3500 S 12TH AV
Address NEW:
3500 S 12TH AV
Apply Date:
12/29/2025
Applicant:
burak bekat
Description:
New ground up tennis center for Pueblo High School 1800000.00

Permit Reviews

Permit Number - TC-COM-1225-02340
Permit Status: In revision
Permit Description: New ground up tennis center for Pueblo High School 1800000.00
Start Date Submittal Complete Date Status  
07/30/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/03/2026 APPROVED Review Details
04/27/2026 COMMERCIAL REVIEW - FULL v.4 05/06/2026 APPROVED Review Details
05/11/2026 SPECIAL INSPECTION REVIEW v.1 05/13/2026 APPROVED Review Details
02/19/2026 COMMERCIAL REVIEW - FULL v.2 03/17/2026 REQUIRES RESUBMIT Review Details
12/31/2025 COMMERCIAL REVIEW - FULL v.1 01/27/2026 REQUIRES RESUBMIT Review Details
05/06/2026 ADMINISTRATIVE v.1 05/06/2026 REQUIRES RESUBMIT Review Details
08/21/2026 COMMERCIAL REVIEW - FULL REVISION v.1 N/A IN REVIEW Review Details
05/11/2026 ADMINISTRATIVE v.2 05/11/2026 APPROVED Review Details
04/02/2026 COMMERCIAL REVIEW - FULL v.3 04/15/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1225-02340
Permit Status: In revision
Permit Description: New ground up tennis center for Pueblo High School 1800000.00
Total Outstanding Activity Conditions - 10
Date Name
01/12/2026 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
01/22/2026 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
01/22/2026 SPECIAL INSPECTION OF SOILS IS REQUIRED.
01/26/2026 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
03/17/2026 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/17/2026 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
03/17/2026 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
04/14/2026 AIR BALANCING REPORT IS REQUIRED.
05/04/2026 WATER STERILIZATION REPORT IS REQUIRED.
07/09/2026 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.

Conditions

Permit Number - TC-COM-1225-02340
Permit Status: In revision
Permit Description: New ground up tennis center for Pueblo High School 1800000.00
Date Description Comments
12/31/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/12/2026 An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
12/31/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/22/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
01/22/2026 SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED.
01/26/2026 Truss/Joist Design plans must be submitted and approved prior to installation of construction elements included in deferred submittal documents.

Outstanding Inspections

Permit Status: In Revision
Permit Number: TC-COM-1225-02340
Permite Description: New ground up tennis center for Pueblo High School 1800000.00
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/27/2026 COT - BULD - SWG Clearance N/A Not Applicable
07/13/2026 COT - LCPL - Yard Water Line N/A Partial Pass
07/21/2026 COT - LCEL - Electrical Underground N/A Partial Pass 7-21-26: Partial pass for 3/0 copper ground tied to reinforcement for new SES.
07/09/2026 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 7/9/26: Footing F2 @ GL A-B/5, (3) Footings F4 @GL A/1-3, (2) Footings F3 @ GL C/1 and C/r, Footing F5 @GL C/3 approved.
08/25/2026 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass 8-25-26: nailing at exterior sheathing verified per SW Schedule. Okay to continue with construction at progress areas. Pending sheathing at monument-schedule this inspection when ready.

Completed Inspections

Permit Status: In Revision
Permit Number: TC-COM-1225-02340
Permit Description: New ground up tennis center for Pueblo High School 1800000.00
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/27/2026 PDSD Building Division Pre-Construction Meeting Passed
07/08/2026 COT - LCPL - Rough Soil Passed Okay to backfill. Shading required. 7/8/2026
07/21/2026 COT - LCBU - Preslab Passed 7-21-26: preslqb, vapor barrier, excavation/reinforcement at footings and slab on grade verified per plans. Okay for concrete placement.
07/21/2026 COT - LCBU - Excavation/Rebar/Zoning Passed 7-21-26: excavation/reinforcement at footings and at slab on grade verified per plans. Okay for concrete placement.
08/17/2026 COT - LCBU - Roof Nailing Passed Passed