Permit: TC-COM-1224-02357
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3400 E SPEEDWAY BL UNIT 120
Address NEW:
3400 E SPEEDWAY BL UNIT 120
Apply Date:
12/16/2024
Applicant:
alex enoch
Description:
NEW PINKBERRY (RESTAURANT) CONVERSION FROM OFFICE
Permit Reviews
Permit Number - TC-COM-1224-02357
Permit Status: Complete
Permit Description: NEW PINKBERRY (RESTAURANT) CONVERSION FROM OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2025 | COMMERCIAL REVIEW - LIMITED v.4 | 06/03/2025 | REQUIRES RESUBMIT |
| 08/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/21/2025 | APPROVED |
| 11/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2025 | APPROVED |
| 03/04/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 03/18/2025 | REQUIRES RESUBMIT |
| 06/10/2025 | RESTAMP - COMMERCIAL v.1 | 06/18/2025 | APPROVED |
| 12/19/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 01/08/2025 | REQUIRES RESUBMIT |
| 09/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/03/2025 | REQUIRES RESUBMIT |
| 06/09/2025 | COMMERCIAL REVIEW - LIMITED v.5 | 06/10/2025 | APPROVED |
| 04/14/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 04/29/2025 | REQUIRES RESUBMIT |
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/08/2025 | APPROVED |
| 09/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/25/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1224-02357
Permit Status: Complete
Permit Description: NEW PINKBERRY (RESTAURANT) CONVERSION FROM OFFICE
| Date | Description | Comments |
|---|---|---|
| 12/19/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 06/10/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 06/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/27/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 12/27/2024 | Pima County Industrial Wastewater Review Required. Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
| 12/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/28/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02357
Permite Description: NEW PINKBERRY (RESTAURANT) CONVERSION FROM OFFICE
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 8-5-25: not applicable. |
| 08/05/2025 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
| 08/05/2025 | COT - LCBU - Preslab | N/A | Not Applicable | 8-5-25: not applicable. |
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| COT - FCON - Sprinkler - Final | N/A | Not Ready | ||
| 08/05/2025 | COT - LCBU - Building Final | N/A | Re-inspection required | 8-5-25: flush control valve must be on accessible side, handrails must be at 36" to the top, missing restroom sign & ADA identification sign on restroom door, missing restroom glass mirror, water closet height shall be between 17-19", adjust bathroom door and entrance to 5 pounds of pressure, wrap hot copper line on water heater with R3 insulation, label junction boxes along south wall of kitchen area, provide ladder for roof access, install ice machine to verify condensation line to floor drain. |
| 08/05/2025 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 8-5-25: flush control valve must be on accessible side, handrails must be at 36" to the top, missing restroom sign & ADA identification sign on restroom door, missing restroom glass mirror, water closet height shall be between 17-19", adjust bathroom door and entrance to 5 pounds of pressure, wrap hot copper line on water heater with R3 insulation, label junction boxes along south wall of kitchen area, provide ladder for roof access, install ice machine to verify condensation line to floor drain. |
| 08/05/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 8-5-25: flush control valve must be on accessible side, handrails must be at 36" to the top, missing restroom sign & ADA identification sign on restroom door, missing restroom glass mirror, water closet height shall be between 17-19", adjust bathroom door and entrance to 5 pounds of pressure, wrap hot copper line on water heater with R3 insulation, label junction boxes along south wall of kitchen area, provide ladder for roof access, install ice machine to verify condensation line to floor drain. |
| 08/05/2025 | COT - LCEL - Grounding/Bonding | N/A | Not Ready | 8-5-25: will inspect after panel upgrade. |
| 08/15/2025 | COT - LCEL - Electrical Final | N/A | Not Ready | Electrical not per plan. Missing switches throughout. Bathroom missing switch open neutral left of entry. Provide printed panel schedule. 8/15/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02357
Permit Description: NEW PINKBERRY (RESTAURANT) CONVERSION FROM OFFICE
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2025 | COT - LCPL - Rough Soil | Passed | ||
| 04/24/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/24/2025 | COT - LCBU - Framing | Passed | ||
| 04/24/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 07/31/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 08/12/2025 | BULD - Electrical Clearance | Passed | Verbal clearance to TEP INCR. Unit #120. (New 200 amp disconnect has been installed along with 3/0 feeders). 8/12/2025 | |
| 08/05/2025 | COT - LCEL - Electrical Above Ceiling | Passed | 8-5-25: approved. | |
| 08/05/2025 | ENGR Engineering Final | Passed | ||
| 08/05/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/05/2025 | COT - LCME - Mechanical Intermediate | Passed | 8-5-25: approved. | |
| 08/22/2025 | COT - FCON - Fire - Final | Passed | ||
| 08/22/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 08/22/2025 | COT - LCBU - Building Final | Passed | Approved. All corrections were completed. 8/22/2025 | |
| 08/22/2025 | COT - LCME - Mechanical Final | Passed | Approved. All corrections were completed. 8/22/2025 | |
| 08/22/2025 | COT - LCPL - Plumbing Final | Passed | Approved. All corrections were completed. 8/22/2025 | |
| 08/22/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 08/22/2025 | COT - LCEL - Electrical Final | Passed | Approved. All corrections were completed. 8/22/2025 |