Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 3400 E SPEEDWAY BL
Search
Annexations & Original City Zoning (OCZ)
Address: 3400 E SPEEDWAY BL
Date - 11/13/2024 3:57 a.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 3400 E SPEEDWAY BL
Date - 11/13/2024 3:57 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000001161 | CLOSED | 10/28/2008 | N/A | Historical Information |
Permits
Address: 3400 E SPEEDWAY BL
Date - 11/13/2024 3:57 a.m.
Total Number Of Permits - (116)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1223-02824 | Issued | 12/13/2023 | 06/15/2024 | UNIT 202 | Commercial Building | Commercial reconnect |
T17OT01191 | Expired | 11/15/2017 | 07/28/2018 | 116 | Sign - Permanent | 1-ILLUM WALL SIGN |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). | |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 100 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 102 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 104 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 108 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 110 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 112 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 200 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 202 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 204 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 206 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 210 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In Review | 10/24/2024 | 04/22/2025 | UNIT 212 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
T19OT01003 | Expired | 10/21/2019 | 04/18/2020 | 110 | Sign - Permanent | 1-ILLUM WALL SIGN |
TS-PRM-0923-00528 | Issued | 09/25/2023 | 03/23/2024 | UNIT 110 | Sign - Permanent | Fab & install non illuminated aluminum reverse channel letters on a raceway |
TD-DEV-0724-00217 | Approved | 07/25/2024 | 07/25/2025 | Development Package | Re-development of existing shopping center to include addition of (2) patios | |
T18FC00530 | Expired | 06/27/2018 | 07/12/2019 | Fire Construction Permit | Automatic Fire Extingshing Sys - 2nd Flr - Relocate 5 Heads*** NO PLANS ***; Commercial Fire Sprinkler Systems - Modification of heads: 5 | |
TS-PRM-0624-00280 | Fees Due | 06/18/2024 | 12/15/2024 | Sign - Permanent | Fabricate & Install Illuminated Pan Channel Letters on raceway | |
T18OT00615 | Expired | 06/07/2018 | 12/04/2018 | 100 | Sign - Permanent | 1-ILLUM WALL SIGN |
TZ-CMP-0524-00072 | Complete | 05/29/2024 | N/A | Zoning Compliance | The subject property, known as the Rancho Center, contains three retail buildings situated on approximately 5.45 acres of land and was constructed between 1950-1995. | |
TR-ROW-0523-00751 | Complete | 05/12/2023 | 08/22/2023 | Right-of-Way (ROW) | SEAL COATING OUT TO ROW.*** | |
T22OT00299 | Complete | 04/25/2022 | 04/28/2023 | Sign - Permanent | non illuminated wall sign on north elevation | |
T22CM02945 | Complete | 04/20/2022 | 06/26/2023 | UNIT 112 | Commercial Building | TI: new studio |
T18OT00374 | Issued | 04/09/2018 | 10/16/2018 | 108 | Sign - Permanent | 1-illum wall sign |
TS-PRM-0124-00015 | Complete | 01/14/2024 | 08/03/2024 | Sign - Permanent | Fabricate & install non-illuminated wall sign. | |
P97AN01809 | ISSUED | 07/24/1997 | N/A | ADDRNEW | ||
T00CM04282 | FINAL | 08/29/2000 | 03/21/2001 | #112 | COMBO | TI:RETAIL |
T00EL01155 | CLOSED | 05/05/2000 | 11/06/2000 | #100 | ELECT | RECONNECT:ELECTRIC:RETAIL |
T00EL01788 | CLOSED | 07/21/2000 | 01/17/2001 | ELECT | RECONNECT:ELECTRIC OFFICE | |
T00EL01934 | CLOSED | 08/10/2000 | 08/11/2001 | ELECT | SIGN:ELECTRIC:1309 | |
T00EL02207 | EXPIRED | 09/15/2000 | 09/11/2001 | #114 | ELECT | SIGN:ELECTRIC:1467 |
T00OT00024 | FINAL | 01/27/2000 | 07/31/2000 | #210 | C-OF-O | C OF O INSPECTION:MASSAGE THERAPY |
T01EL01839 | FINAL | 07/13/2001 | 05/04/2002 | #200 | ELECT | ELECTRIC:SIGN:2730 |
T01EL02470 | EXPIRED | 10/05/2001 | 04/07/2002 | #116 | ELECT | RECONNECT:ELECTRIC:OFFICE |
T02AN00200 | ISSUED | 03/05/2002 | N/A | #100 | ADDRNEW | |
T02BU01073 | FINAL | 04/10/2002 | 10/23/2002 | #100 | SPKLR | FIRE SPKR:RELOCATE 3 |
T02CM01345 | C OF O | 03/12/2002 | 10/22/2002 | #100 | COMBO | TI:RETAIL |
T02EL00526 | EXPIRED | 03/13/2002 | 09/11/2002 | #116 | ELECT | RECONNECT:ELECTRIC:RETAIL |
T02EL02308 | FINAL | 11/25/2002 | 05/25/2003 | #204 | ELECT | RECONNECT:ELECTRIC:RETAIL |
T02OT00312 | C OF O | 02/27/2002 | 09/04/2002 | #116 | C-OF-O | C OF O:RETAIL |
T02OT00385 | FINAL | 03/13/2002 | 09/22/2002 | #116 | SIGN | SIGN:3750 |
T02OT00723 | CLOSED | 05/10/2002 | 12/27/2008 | #100 | SIGN | SIGN:3985 |
T02OT00824 | FINAL | 05/30/2002 | 12/11/2002 | #100 | SIGN | SIGN:4048 |
T03CM00695 | C OF O | 02/10/2003 | 11/03/2003 | #124 | COMBO | TI:RESTAURANT |
T03CM05551 | C OF O | 11/28/2003 | 08/25/2004 | #210 | COMBO | REMODEL TI:FITNESS 44' x 39' SPACE, METAL STUDS W/ GYP BD |
T03EL02306 | EXPIRED | 11/25/2003 | 05/26/2004 | #206 | ELECT | RECONNECT:ELECTRIC OFFICE |
T03EL02360 | FINAL | 12/05/2003 | 08/22/2004 | #210 | ELECT | ELECTRIC:RECONNECT |
T03OT00101 | FINAL | 01/23/2003 | 08/12/2003 | #204 | SIGN | SIGN:ELECTRIC:4987 |
T03OT00393 | FINAL | 03/12/2003 | 10/12/2003 | SIGN | SIGN:ELECTRICl#5173 | |
T03OT00697 | FINAL | 04/24/2003 | 12/06/2003 | #118 | SIGN | SIGN:5399 |
T03OT01426 | FINAL | 08/06/2003 | 04/06/2004 | #118 | SIGN | SIGN:5895 |
T03OT01427 | FINAL | 08/06/2003 | 03/20/2004 | #118 | SIGN | SIGN:5894 |
T03OT02258 | FINAL | 12/18/2003 | 07/25/2004 | #210 | SIGN | SIGN:ELECTRIC:6492 |
T04OT00229 | FINAL | 02/05/2004 | 09/06/2004 | #110 | SIGN | SIGN:6678 |
T05BU02931 | FINAL | 12/12/2005 | 06/27/2006 | #112 | SPKLR | FIRE SPKL: ADD 5 AND RELOCATE 1 |
T05CM05898 | C OF O | 11/28/2005 | 06/27/2006 | #112 | COMBO | TI:RETAIL |
T05EL02031 | FINAL | 10/03/2005 | 04/04/2006 | #110 | ELECT | ELEC RECONNECT |
T05OT03109 | FINAL | 12/14/2005 | 06/26/2006 | #114 | SIGN | 10260 |
T08MS00206 | ISSUED | 06/13/2008 | N/A | MISC | ||
T08OT02027 | FINAL | 08/26/2008 | 03/16/2009 | #100 | SIGN | 15508 |
T09AN00569 | ISSUED | 10/19/2009 | N/A | #206 | ADDRNEW | |
T09BU00698 | FINAL | 05/15/2009 | 01/18/2010 | SPKLR | Add 3 fire sprinklers | |
T09BU01441 | FINAL | 09/25/2009 | 04/06/2010 | #110 | SPKLR | Add 2 fire sprinklers |
T09BU01473 | FINAL | 09/30/2009 | 03/31/2010 | #210 | SPKLR | Relocate 1 fire sprinkler |
T09CM02582 | C OF O | 09/23/2009 | 04/12/2010 | #206 | COMBO | TI and CofO: ACUPUNCTURE OFFICE |
T09MS00223 | ISSUED | 08/28/2009 | N/A | #118 | MISC | |
T09OT01824 | C OF O | 08/28/2009 | 02/28/2010 | #118 | C-OF-O | C OF O: MAIL & PARCEL SERVICE |
T09OT02033 | FINAL | 09/23/2009 | 05/09/2010 | #120 | SIGN | 17225 |
T09OT02241 | VOID | 10/19/2009 | N/A | #206* | C-OF-O | C OF O: ACUPUNCTURE CLINIC, HERB RETAIL |
T11BU01575 | FINAL | 11/30/2011 | 06/12/2012 | #106 | SPKLR | INSTALL 2 NEW AND RELOCATE 6 FIRE SPRINKLERS. |
T11BU01619 | FINAL | 12/08/2011 | 06/12/2012 | #110 | SPKLR | Relocate 5 fire sprinklers |
T11CM03591 | C OF O | 11/22/2011 | 06/13/2012 | #106 | COMBO | TI: ADD INTERIOR PARTITIONS |
T11CM03592 | C OF O | 11/22/2011 | 06/16/2012 | #110 | COMBO | TI: RETAIL |
T11CM03901 | C OF O | 12/22/2011 | 07/25/2012 | #104 | COMBO | TI: OFFICE |
T11EL00264 | FINAL | 01/28/2011 | 07/31/2011 | #114 | ELECT | RECONNECT ELECTRIC; BUS. |
T11EL01126 | FINAL | 04/19/2011 | 04/17/2012 | #100 | ELECT | RECONNECT:ELECTRIC:RETAIL |
T11EL02770 | FINAL | 10/20/2011 | 04/22/2012 | #120 | ELECT | RECONNECT ELECTRIC; COMM |
T11EL03139 | FINAL | 12/06/2011 | 06/18/2012 | #102 | ELECT | RECONNECT ELECTRIC; COMM |
T11EL03140 | FINAL | 12/06/2011 | 06/05/2012 | #104 | ELECT | RECONNECT ELECTRIC; COMM |
T11OT00344 | FINAL | 02/22/2011 | 11/20/2011 | #114 | SIGN | BANNER; 90 DAY FROM 02/22/11 - 05/23/11 |
T12BU00110 | FINAL | 01/24/2012 | 07/23/2012 | #104 | SPKLR | relocate 2 fire sprinklers |
T14BU00895 | WITHDRWN | 08/08/2014 | N/A | #124 | BUILD | FIRE ALARM |
T14BU00902 | FINAL | 08/12/2014 | 02/22/2015 | BUILD | INSTALL ANSUL SYSTEM FIRE SUPPRESSION | |
T14BU00929 | FINAL | 08/18/2014 | 02/22/2015 | #124 | SPKLR | RELOCATE 5 SPRINKLER HEADS |
T14BU01221 | FINAL | 11/07/2014 | 05/09/2015 | #100 | SPKLR | FIRE SPRINKLER |
T14CM00787 | EXPIRED | 02/10/2014 | 09/16/2014 | #124 | COMBO | TI: SHELL |
T14CM01840 | C OF O | 04/02/2014 | 02/24/2015 | #124 | COMBO | RESTAURANT |
T14CM07269 | C OF O | 10/28/2014 | 05/09/2015 | #100 | COMBO | TI: OUTPATIENT CLINIC |
T14CM07369 | FINAL | 10/30/2014 | 05/02/2015 | #204 | COMBO | ELECTRIC RECONNECT |
T14OT00230 | EXPIRED | 02/21/2014 | 08/24/2014 | #124 | SIGN | 2- IDENTICAL ILLUM WALL SIGNS ON THE N. & W. ELEVS. / C OF C 2/25/14 |
T15OT00017 | EXPIRED | 01/05/2015 | 07/11/2015 | #204 | SIGN | 1 ILLUM WALL SIGN ON N. ELEV AT 10.5 SQFT |
T15OT00621 | VOID | 05/07/2015 | 11/04/2015 | #210 | C-OF-O | C OF O- YOGA STUDIO |
T15OT01229 | FINAL | 09/14/2015 | 05/01/2016 | #124 | SIGN | BANNER 45 DAYS |
T15OT01391 | FINAL | 10/13/2015 | 05/11/2016 | #110 | SIGN | 1- ILLUM WALL SIGN |
T16CM00663 | EXPIRED | 01/28/2016 | 07/27/2016 | #120 | COMBO | ELECTRIC RECONNECT |
T16CM09463 | C OF O | 12/20/2016 | 07/19/2017 | #112 | COMBO | TI; OFFICE |
T16OT00352 | FINAL | 03/17/2016 | 01/23/2017 | #120 | SIGN | 1- ILLUM WALL SIGN |
T17CM07755 | L OF C | 10/13/2017 | 05/16/2018 | #116 | COMBO | TI: WHITE BOX |
T17CM08560 | C OF O | 11/16/2017 | 06/11/2018 | #116 | COMBO | TI: EXERCISE ROOM |
T17FC00901 | FINAL | 10/31/2017 | 05/06/2018 | FIRECONS | MODIFY SPRINKLER SYSTEM PER CHANGES TO TENANT. | |
T18CM03267 | L OF C | 05/01/2018 | 01/16/2019 | #210 | COMBO | TI: OFFICE |
T18CM05699 | C OF O | 07/23/2018 | 02/20/2019 | #100 | COMBO | BARBER SHOP |
T18OT00739 | FINAL | 07/09/2018 | 02/27/2019 | #210 | SIGN | 1- ILLUM WALL & 1 ILLUM UNDER CANOPY SIGNS |
T20RW01850 | FINAL | 03/24/2020 | 06/06/2020 | ROW | Riser up TEP pole on the East side of Jones and South of Fairmont Overlash 1189' going South continue West 25' and riser down,Riser down and trench/bore going South 350' place 2 2-2 vaults. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. TRAFFIC CONTROL: NORMAL OPERATING HOURS OF 9:00 AM - 3:30 PM WILL RESUME AFTER APRIL 30, 2020. | |
T97BU00659 | FINAL | 05/06/1997 | 11/08/1997 | #114 | SPKLR | FIRE SPKLR:21 NEW |
T97BU01400 | WITHDRWN | 07/23/1997 | N/A | BUILD | CARPORTS | |
T97CM00700 | C OF O | 04/07/1997 | 11/12/1997 | #114 | COMBO | TI:OFFICE |
T97EL00195 | FINAL | 03/20/1997 | 09/20/1997 | #116 | ELECT | RECONNECT:BUSINESS |
T97EL00671 | FINAL | 05/22/1997 | 11/23/1997 | #104 | ELECT | RECONNECT:RETAIL |
T98BU00423 | FINAL | 02/17/1998 | 08/19/1998 | #300 | SPKLR | FIRE SPKR:ADD 4 RELOC 1 |
T98CM00320 | C OF O | 01/26/1998 | 08/22/1998 | #206 | COMBO | TI:OFFICE |
T98CM01986 | FINAL | 05/07/1998 | 12/08/1998 | #104 | COMBO | REMODEL TI:OFFICE 28 X 42 SPACE REMODEL, METAL STUDS W/ GYP. BD. |
TUC-20138 | CERTIFIC | 07/01/1997 | 06/01/1998 | VESSEL | ||
TUC-20139 | CERTIFIC | 07/01/1997 | 06/01/1998 | VESSEL |
Plans
Address: 3400 E SPEEDWAY BL
Date - 11/13/2024 3:57 a.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T09FR01799 | COMPLETE | 05/27/2009 | N/A | APPEALS -- APPL | Petition of appeal to the Fire Code Official- replace outdated sprinkler heads |
Record Requests
Address: 3400 E SPEEDWAY BL
Date - 11/13/2024 3:57 a.m.
Total Number Of Requests - (3)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0623-03327 | Complete | 06/15/2023 | 06/16/2023 | Requests | TI: new studio |
REQ-0624-04120 | Complete | 06/05/2024 | 06/06/2024 | Requests | *ALL HISTORICAL DATA PREVIOUSLY UPLOADED UNDER ACTIVITY NUMBER 'REQ-0723-04035' ON PRO.* - Construction history |
REQ-0723-04035 | Complete | 07/24/2023 | 08/17/2023 | Requests | *ALL HISTORICAL DATA UPLOADED. FOR NEWER/CURRENT INFO, PLEASE CHECK PRO.* - Looking for any construction documents pertaining to the original shell building. |