Permit: TC-COM-1224-02339
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
3250 E SPEEDWAY BL
Address NEW:
3250 E SPEEDWAY BL
Apply Date:
12/12/2024
Applicant:
Brandy Burke
Description:
New construction of a 1,970sf HTeaO Tea Bar with a drive-thru and a 236sf cooler.
Permit Reviews
Permit Number - TC-COM-1224-02339
Permit Status: Issued
Permit Description: New construction of a 1,970sf HTeaO Tea Bar with a drive-thru and a 236sf cooler.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/17/2025 | APPROVED |
| 07/15/2025 | RESTAMP - COMMERCIAL v.1 | 07/15/2025 | APPROVED |
| 06/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/18/2025 | APPROVED |
| 02/25/2025 | COMMERCIAL REVIEW - FULL v.2 | 03/19/2025 | REQUIRES RESUBMIT |
| 07/14/2025 | COMMERCIAL REVIEW - FULL v.5 | 07/15/2025 | APPROVED |
| 10/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/29/2025 | APPROVED |
| 11/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2025 | APPROVED |
| 04/14/2025 | COMMERCIAL REVIEW - FULL v.3 | 04/29/2025 | REQUIRES RESUBMIT |
| 09/29/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 10/21/2026 | REQUIRES RESUBMIT |
| 12/18/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/13/2025 | REQUIRES RESUBMIT |
| 07/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2025 | APPROVED |
| 07/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2025 | REQUIRES RESUBMIT |
| 06/25/2025 | COMMERCIAL REVIEW - FULL v.4 | 07/01/2025 | REQUIRES RESUBMIT |
| 11/04/2026 | SPECIAL INSPECTION REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1224-02339
Permit Status: Issued
Permit Description: New construction of a 1,970sf HTeaO Tea Bar with a drive-thru and a 236sf cooler.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/15/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 07/15/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 07/15/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
| 07/15/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1224-02339
Permit Status: Issued
Permit Description: New construction of a 1,970sf HTeaO Tea Bar with a drive-thru and a 236sf cooler.
| Date | Description | Comments |
|---|---|---|
| 12/18/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 07/15/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 07/15/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 07/15/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/15/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 04/15/2025 | An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted, with parts A and B completed and sealed, and reviewed prior to issuance of this permit. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf | |
| 07/01/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/15/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to Final Inspection of this permit. | |
| 07/15/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/18/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 07/15/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 07/15/2025 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1224-02339
Permite Description: New construction of a 1,970sf HTeaO Tea Bar with a drive-thru and a 236sf cooler.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2026 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Under slab. |
| 09/08/2026 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Building footings. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1224-02339
Permit Description: New construction of a 1,970sf HTeaO Tea Bar with a drive-thru and a 236sf cooler.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2026 | COT - HCBU - Building Progress | Passed | ||
| 10/08/2026 | COT - HCBU - Preslab | Passed | ||
| 10/14/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/14/2026 | COT - HCBU - Roof Nailing | Passed | ||
| 10/19/2026 | COT - HCEL - Electrical Progress | Passed | Underground feeds to sign and light poles. | |
| 11/04/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Raised floor for Vat area. | |
| 11/17/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 11/18/2026 | COT - HCBU - Framing | Passed | ||
| 11/18/2026 | COT - HCPL - Gas Pressure Test | Passed | ||
| 11/18/2026 | COT - HCEL - Electrical Intermediate | Passed | missing from permit | |
| 11/18/2026 | COT - HCPL - Plumbing Progress | Passed | ||
| 11/18/2026 | COT - HCPL - Rough Soil | Passed |