Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/21/2023
Applicant:
James Beard
Description:
build out from an H and R office to a veternarian facility

Permit Reviews

Permit Number - TC-COM-1223-02905
Permit Status: Complete
Permit Description: build out from an H and R office to a veternarian facility
Start Date Submittal Complete Date Status  
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2025 APPROVED Review Details
12/22/2023 COMMERCIAL REVIEW - FULL v.1 01/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1223-02905
Permit Status: Complete
Permit Description: build out from an H and R office to a veternarian facility
Date Description Comments
12/26/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
12/26/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/26/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1223-02905
Permite Description: build out from an H and R office to a veternarian facility
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/30/2024 COT - BULD - SWG Clearance N/A Not Applicable
04/30/2024 COT - HCME - Mechanical Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1223-02905
Permit Description: build out from an H and R office to a veternarian facility
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/30/2024 COT - HCBU - Preslab Passed
04/30/2024 COT - HCME - Mechanical Above Ceiling Passed
06/27/2024 COT - HCBU - Framing Passed
07/15/2024 COT - HCPL - Plumbing Above Ceiling Passed
07/15/2024 COT - HCEL - Electrical Progress Passed
07/15/2024 COT - HCPL - Plumbing Intermediate Passed
07/15/2024 COT - HCEL - Electrical Above Ceiling Passed Ok to insulate and sheet rock throughout.
07/15/2024 COT - HCBU - Building Above Ceiling Passed Ok to insulate and sheet rock throughout.
03/07/2025 COT - HCME - Mechanical Final Passed
03/10/2025 BULD - Electrical Clearance Passed No clearance required.
03/10/2025 COT - FCON - Fire - Final Passed
03/10/2025 ENGR Engineering Final Passed Unit number 142 should be listed on the front door.
03/10/2025 TRSP - ROW - Final/Close-Out Passed
03/10/2025 COT - HCBU - Building Final Passed
03/10/2025 COT - HCBU - Building Progress Passed
03/10/2025 COT - HCEL - Electrical Final Passed
03/10/2025 COT - HCBU - CofO Passed OK to make application for Certificate of Occupancy.
03/10/2025 COT - HCEL - Grounding/Bonding Passed
03/10/2025 COT - HCME - Venting Passed