Permit: TC-COM-1223-02788
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
2525 N TUCSON BL
Address NEW:
2525 N TUCSON BL
Apply Date:
12/05/2023
Applicant:
Permit Department
Description:
Installation of solar panels on an existing commercial roof. 71.225 kW. The addition of 12 circuits and 185 Solar panels
Permit Reviews
Permit Number - TC-COM-1223-02788
Permit Status: Inspections
Permit Description: Installation of solar panels on an existing commercial roof. 71.225 kW. The addition of 12 circuits and 185 Solar panels
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/11/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/05/2024 | REQUIRES RESUBMIT |
| 02/11/2025 | COMMERCIAL REVIEW - FULL v.2 | 03/04/2025 | REQUIRES RESUBMIT |
| 03/05/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/18/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1223-02788
Permit Status: Inspections
Permit Description: Installation of solar panels on an existing commercial roof. 71.225 kW. The addition of 12 circuits and 185 Solar panels
| Date | Description | Comments |
|---|---|---|
| 01/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1223-02788
Permite Description: Installation of solar panels on an existing commercial roof. 71.225 kW. The addition of 12 circuits and 185 Solar panels
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - CSOL - Grounding/Bonding Solar Project | N/A | Canceled | CA by contractor | |
| 06/12/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the line-side tap to existing 400A panel - DGL Clearance was called into TEP at 12:15pm Pending solar |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1223-02788
Permit Description: Installation of solar panels on an existing commercial roof. 71.225 kW. The addition of 12 circuits and 185 Solar panels
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 08/28/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 08/28/2025 | COT - LCBU - Building Final | Passed |