Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
7760 E SPEEDWAY BL
Apply Date:
11/26/2025
Applicant:
Deborah Sylva
Description:
NTERIOR TENANT IMPROVEMENT OF AN EXISTING 2,372 SF TENANT SPACE. WORK INCLUDES NEW NON-BEARING PARTITIONS, DOORS, DROP CEILINGS, MILLWORK, NEW ELECTRICAL, PLUMBING AND MECHANICAL DISTRIBUTION.

Permit Reviews

Permit Number - TC-COM-1125-02155
Permit Status: Complete
Permit Description: NTERIOR TENANT IMPROVEMENT OF AN EXISTING 2,372 SF TENANT SPACE. WORK INCLUDES NEW NON-BEARING PARTITIONS, DOORS, DROP CEILINGS, MILLWORK, NEW ELECTRICAL, PLUMBING AND MECHANICAL DISTRIBUTION.
Start Date Submittal Complete Date Status  
01/06/2026 COMMERCIAL REVIEW - FULL v.2 01/20/2026 APPROVED Review Details
03/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/05/2026 APPROVED Review Details
01/21/2026 ADMINISTRATIVE v.1 01/21/2026 REQUIRES RESUBMIT Review Details
01/23/2026 ADMINISTRATIVE v.2 01/23/2026 APPROVED Review Details
01/20/2026 RESTAMP - COMMERCIAL v.1 01/21/2026 APPROVED Review Details
12/04/2025 COMMERCIAL REVIEW - FULL v.1 12/30/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1125-02155
Permit Status: Complete
Permit Description: NTERIOR TENANT IMPROVEMENT OF AN EXISTING 2,372 SF TENANT SPACE. WORK INCLUDES NEW NON-BEARING PARTITIONS, DOORS, DROP CEILINGS, MILLWORK, NEW ELECTRICAL, PLUMBING AND MECHANICAL DISTRIBUTION.
Date Description Comments
03/04/2026 AIR BALANCING REPORT IS REQUIRED.
12/04/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/04/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/04/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1125-02155
Permite Description: NTERIOR TENANT IMPROVEMENT OF AN EXISTING 2,372 SF TENANT SPACE. WORK INCLUDES NEW NON-BEARING PARTITIONS, DOORS, DROP CEILINGS, MILLWORK, NEW ELECTRICAL, PLUMBING AND MECHANICAL DISTRIBUTION.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/26/2026 COT - HCPL - Sewer N/A Not Applicable
02/27/2026 COT - HCPL - Plumbing Roof Drains N/A Not Applicable
03/06/2026 BULD - Electrical Clearance N/A Not Applicable power already on
03/06/2026 COT - BULD - SWG Clearance N/A Not Applicable
03/06/2026 ENGR Engineering Final N/A Not Ready 6/3/25
Dumpster, Connex box, Portajohn, equipment and materials on site. Reschedule inspection when these items are removed and access is clear.
03/09/2026 COT - HCPL - Plumbing Final N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1125-02155
Permit Description: NTERIOR TENANT IMPROVEMENT OF AN EXISTING 2,372 SF TENANT SPACE. WORK INCLUDES NEW NON-BEARING PARTITIONS, DOORS, DROP CEILINGS, MILLWORK, NEW ELECTRICAL, PLUMBING AND MECHANICAL DISTRIBUTION.
Total Completed Inspections - 25
Date Description Inspector Results Comments
01/26/2026 COT - HCEL - Electrical Underground Passed
01/26/2026 COT - HCPL - Rough Soil Passed
02/05/2026 COT - HCBU - Framing Passed
02/05/2026 COT - HCBU - Interior Shear Bracing Passed
02/05/2026 COT - HCBU - Preslab Passed
02/05/2026 COT - HCME - Mechanical Intermediate Passed
02/05/2026 COT - HCPL - Plumbing Intermediate Passed
02/05/2026 COT - HCEL - Electrical Intermediate Passed
02/20/2026 COT - HCBU - Building Above Ceiling Passed
02/20/2026 COT - HCEL - Electrical Above Ceiling Passed
02/20/2026 COT - HCME - Mechanical Above Ceiling Passed
02/20/2026 COT - HCPL - Plumbing Above Ceiling Passed
02/20/2026 COT - HCPL - Plumbing Progress Passed
02/20/2026 COT - HCME - Mechanical Progress Passed
02/20/2026 COT - HCEL - Electrical Progress Passed
02/27/2026 COT - HCME - Venting Passed
03/06/2026 COT - FCON - Fire - Final Passed
03/06/2026 TRSP - ROW - Final/Close-Out Passed
03/06/2026 COT - HCBU - Exterior Clips/Sheathing Passed Passed 3/6/26
03/09/2026 ENGR Engineering Final Passed Portajohn left in parking lot is scheduled for pick up today. Otherwise, all clear.
03/10/2026 COT - HCPL - Plumbing Final Passed
03/10/2026 COT - HCBU - Building Final Passed
03/10/2026 COT - HCBU - CofO Passed
03/10/2026 COT - HCEL - Electrical Final Passed
03/10/2026 COT - HCME - Mechanical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
TC-COM-1125-02155 WATER REPORT-2026-02-26_V1.PDF DOCUMENTS VIEW
TC-COM-1125-02155 TEST - BALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-260105 MDN AZ062 FULL SET_V2.PDF DOCUMENTS VIEW