Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | ENGR Engineering Final | Not Ready | 6/3/25 Dumpster, Connex box, Portajohn, equipment and materials on site. Reschedule inspection when these items are removed and access is clear. |
|
| 03/09/2026 | ENGR Engineering Final | Passed | Portajohn left in parking lot is scheduled for pick up today. Otherwise, all clear. |