Permit: TC-COM-1125-02147
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
2755 S HARRISON RD
Address NEW:
2755 S HARRISON RD
Apply Date:
11/25/2025
Applicant:
Cary Broschat
Description:
Install single axis solar tracker system 336.6 KW dc 265 KW ac Related to: TD-DEV-0824-00227
Permit Reviews
Permit Number - TC-COM-1125-02147
Permit Status: Inspections
Permit Description: Install single axis solar tracker system 336.6 KW dc 265 KW ac
Related to: TD-DEV-0824-00227
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/02/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/31/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1125-02147
Permit Status: Inspections
Permit Description: Install single axis solar tracker system 336.6 KW dc 265 KW ac
Related to: TD-DEV-0824-00227
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/18/2025 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
| 12/18/2025 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
Conditions
Permit Number - TC-COM-1125-02147
Permit Status: Inspections
Permit Description: Install single axis solar tracker system 336.6 KW dc 265 KW ac
Related to: TD-DEV-0824-00227
| Date | Description | Comments |
|---|---|---|
| 12/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1125-02147
Permite Description: Install single axis solar tracker system 336.6 KW dc 265 KW ac
Related to: TD-DEV-0824-00227
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2026 | COT - LCBU - Framing | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1125-02147
Permit Description: Install single axis solar tracker system 336.6 KW dc 265 KW ac
Related to: TD-DEV-0824-00227
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2026 | COT - CSOL - Electrical Underground Solar Project | Passed | 5/13/26 Last under ground, 570 feet from pull box 3 to 2. |
|
| 07/31/2026 | COT - LCEL - Electrical Final | Passed | ||
| 07/31/2026 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 07/31/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/31/2026 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 07/31/2026 | BULD - Electrical Clearance | Passed | ||
| 07/31/2026 | COT - LCBU - Building Final | Passed |