Permit: TC-COM-1124-02153
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
3800 W STARR PASS BL BLDG 1
Address NEW:
3800 W STARR PASS BL BLDG 1
Apply Date:
11/08/2024
Applicant:
Jeff Cooper
Description:
Remodel existing guest rooms
Permit Reviews
Permit Number - TC-COM-1124-02153
Permit Status: Issued
Permit Description: Remodel existing guest rooms
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/29/2025 | REQUIRES RESUBMIT |
| 05/01/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 05/19/2025 | APPROVED |
| 01/15/2025 | RESTAMP - COMMERCIAL v.1 | 01/16/2025 | APPROVED |
| 09/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/22/2025 | APPROVED |
| 01/06/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/15/2025 | APPROVED |
| 05/19/2025 | RESTAMP - COMMERCIAL v.1 | 05/22/2025 | APPROVED |
| 11/12/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/10/2024 | REQUIRES RESUBMIT |
| 06/20/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 07/02/2025 | APPROVED |
| 09/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1124-02153
Permit Status: Issued
Permit Description: Remodel existing guest rooms
| Date | Description | Comments |
|---|---|---|
| 11/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/04/2025 | Project Description: Record P25WX00224: Sewer Connection Permit Record Status: Final MARRIOTT STAR PASS HOTEL - GUEST ROOM T.I.'S: D1 PER PLUMBING DRAWING P1.0 K1 PER PLUMBING DRAWING P1.1 CD2 PER PLUMBING DRAWING P1.2 CD2 ALTERNATE PER PLUMBING DRAWING P1.3 CK2 PER PLUMBING DRAWING P1.4 K2 PER PLUMBING DRAWING P1.5 CONNECTING TO EXISTING BUILDING SEWER PER DRAWINGS AND HISTORIC SEWER PERMITS #PT03S02681 DATED 5/30/03 AND #PT03S05878 DATED 3/15/04 CONNECTING TO EXISTING 7- 2" WATER METERS PER PIMA MAPS AND HISTORIC SEWER PERMITS #PT03S02681 DATED 5/30/03 AND #PT03S05878 DATED 3/15/04 | |
| 01/15/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1124-02153
Permite Description: Remodel existing guest rooms
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Canceled | |
| 09/12/2025 | COT - FCON - Alarm - Final | N/A | Partial Pass | Fire alarm shall be cleared of all deficiencies. |
| 10/22/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Level #3, room units 3100 - 3114, 3114 - 3234. Ok to cover bathroom ceilings in progress areas. |
| 10/08/2025 | COT - HCEL - Electrical Final | N/A | Partial Pass | 10/8/25: TCO Level 4 for units 7215,7216,7217,7218,7219,7220,7221,7222,7223,7224,7225,7226,7227,7228,7229,7230,7231,7232,7233,7234. |
| 09/16/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for tco level 4 for buildings 4,5,and 6. |
| 09/12/2025 | COT - HCPL - Plumbing Final | N/A | Partial Pass | Building #7; Level #5, Rooms 5725 - 5748: complete. Ok to apply for TCO for level #5. |
| 09/16/2025 | COT - HCBU - Building Final | N/A | Partial Pass | Level #4, Building #7 complete. Ok to apply for level #4 TCO. |
| 06/23/2025 | COT - HCPL - Plumbing Intermediate | N/A | Re-inspection required | Partial pass. Rough in electrical in walls. 6th floor 24 units east end for guest rooms pending puddy pack on all receptacles at party walls within 2’ from each other. 6/11/2025 6/23/25: 6725-6748, 6742 not ready, 6746 not ready, 6743 not ready, 6750 not ready, 6741 not ready, 6739 not ready, supports on pex lines required throughout top track and vertical/horizontal runs, incomplete rough-ins throughout. Full walk through required on next inspection. Copper hangers must be coated or taped off. Putty packs required at bathroom receptacle that are in back to back cell within 24" seal penetrations in floor. |
| 06/23/2025 | COT - HCEL - Electrical Intermediate | N/A | Re-inspection required | Partial pass. Rough in electrical in walls. 6th floor 24 units east end for guest rooms pending puddy pack on all receptacles at party walls within 2’ from each other. 6/11/2025 6/23/25: 6725-6748, 6742 not ready, 6746 not ready, 6743 not ready, 6750 not ready, 6741 not ready, 6739 not ready, supports on pex lines required throughout top track and vertical/horizontal runs, incomplete rough-ins throughout. Full walk through required on next inspection. Copper hangers must be coated or taped off. Putty packs required at bathroom receptacle that are in back to back cell within 24" seal penetrations in floor. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1124-02153
Permit Description: Remodel existing guest rooms
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2025 | ENGR Engineering Final | Passed | ||
| 09/09/2025 | TRSP - ROW - Final/Close-Out | Passed |