Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Intermediate
Permit Number - TC-COM-1124-02153
Inspection Description - COT - HCPL - Plumbing Intermediate
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | Partial pass. 4th floor building 5 all unit bathrooms approved. Pending suite. Okay to proceed progress areas. 1/22/2026 | |
| 02/03/2026 | COT - HCPL - Plumbing Intermediate | Not Ready | Building #5; Room units 3574 - 3595 will be rescheduled when complete | |
| 02/05/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | 3rd floor bathroom in wall and above approved. 3575-3593. Plumbing approved. Okay to proceed progress areas. 2/5/2026 | |
| 02/17/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | In wall plumbing in room units #2575 - 2595. OK to patch and cover progress areas. | |
| 02/27/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | Building #6; Level #6 Room unit 6601 - 6624. Ok to patch and cover progress areas. | |
| 03/13/2026 | COT - HCPL - Plumbing Intermediate | Re-inspection required | 3-13-26: room's 5624, 5622- electrical secure mc cable within 12" of box, 5620, 5618-support Mc cable, 5616, 5614, , 5612-support Mc cable and add knockout to receptacle behind shower, 5610, cap off all receptacles/light fixtures not in use in all units, and fire foam all penetrations above ceiling in all units, Copper lines 3/4" or larger require R3 insulation, add 10 mil tape to copper lines in contact with framing members. Any can lights within 12" of pex lines require blocking using osb, plywood, 2x 4. Stopped inspection -reschedule at your convenience. | |
| 03/16/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | All corrections were made. Okay to proceed with progress areas at rooms 5601-5624. 3/16/2026 | |
| 06/23/2025 | COT - HCPL - Plumbing Intermediate | Re-inspection required | Partial pass. Rough in electrical in walls. 6th floor 24 units east end for guest rooms pending puddy pack on all receptacles at party walls within 2’ from each other. 6/11/2025 6/23/25: 6725-6748, 6742 not ready, 6746 not ready, 6743 not ready, 6750 not ready, 6741 not ready, 6739 not ready, supports on pex lines required throughout top track and vertical/horizontal runs, incomplete rough-ins throughout. Full walk through required on next inspection. Copper hangers must be coated or taped off. Putty packs required at bathroom receptacle that are in back to back cell within 24" seal penetrations in floor. |
|
| 07/07/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Partial pass. Rough in electrical in walls. 6th floor 24 units east end for guest rooms pending puddy pack on all receptacles at party walls within 2’ from each other. 6/11/2025 6/23/25: 6725-6748, 6742 not ready, 6746 not ready, 6743 not ready, 6750 not ready, 6741 not ready, 6739 not ready, supports on pex lines required throughout top track and vertical/horizontal runs, incomplete rough-ins throughout. Full walk through required on next inspection. Copper hangers must be coated or taped off. Putty packs required at bathroom receptacle that are in back to back cell within 24" seal penetrations in floor. 7/7/25: 6th floor shower pan under water test ok to proceed with tile placement at progress areas. |
|
| 07/15/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 7/17/25: plumbing intermediate approved in units (5725,5726,5727,5728,5729,5730,5731,5732,5733,5734,5735,5736,5737,5738,5739,5740,5741,5742,5743,5744,5745,5746,5747,5748 | |
| 07/21/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Partial pass. Rough in electrical in walls. 6th floor 24 units east end for guest rooms pending puddy pack on all receptacles at party walls within 2’ from each other. 6/11/2025 6/23/25: 6725-6748, 6742 not ready, 6746 not ready, 6743 not ready, 6750 not ready, 6741 not ready, 6739 not ready, supports on pex lines required throughout top track and vertical/horizontal runs, incomplete rough-ins throughout. Full walk through required on next inspection. Copper hangers must be coated or taped off. Putty packs required at bathroom receptacle that are in back to back cell within 24" seal penetrations in floor. 7/7/25: 6th floor shower pan under water test ok to proceed with tile placement at progress areas. 7/17/25: plumbing intermediate approved in units (5725,5726,5727,5728,5729,5730,5731,5732,5733,5734,5735,5736,5737,5738,5739,5740,5741,5742,5743,5744,5745,5746,5747,5748 7/21/25: plumbing intermediate approved in units 4726,4728,4730,4732,4734,4636,4738,4740 |
|
| 07/25/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Partial pass. Rough in electrical in walls. 6th floor 24 units east end for guest rooms pending puddy pack on all receptacles at party walls within 2’ from each other. 6/11/2025 6/23/25: 6725-6748, 6742 not ready, 6746 not ready, 6743 not ready, 6750 not ready, 6741 not ready, 6739 not ready, supports on pex lines required throughout top track and vertical/horizontal runs, incomplete rough-ins throughout. Full walk through required on next inspection. Copper hangers must be coated or taped off. Putty packs required at bathroom receptacle that are in back to back cell within 24" seal penetrations in floor. 7/7/25: 6th floor shower pan under water test ok to proceed with tile placement at progress areas. 7/17/25: plumbing intermediate approved in units (5725,5726,5727,5728,5729,5730,5731,5732,5733,5734,5735,5736,5737,5738,5739,5740,5741,5742,5743,5744,5745,5746,5747,5748 7/21/25: plumbing intermediate approved in units 4726,4728,4730,4732,4734,4636,4738,4740 7/25/25: plumbing intermediate approved in units 4725,4727,4729,4731,4733,4735,4737,4739,4741. |
|
| 08/05/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 8/5/25: Showers under test in units 4725,4727,4729,4731,4733,4735,4737,4739,4741.4726,4728,4730,4732,4734,4636,4738,4740 | |
| 08/19/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 8/19/25: plumbing in wall approved in restrooms for units 7233,7231,7229,7227,7225,7223,7221,7219,7216,7215,7217,7218,7220, 7222,7224,7226,7228,7230,7232,7234 | |
| 08/26/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Building #2; Level #6, rooms 6215 - 6234; Building #1 Level #6, rooms 6105 - 6106, 6109 - 6114. | |
| 09/02/2025 | COT - HCPL - Plumbing Intermediate | Canceled | Contractor cancelled; reschedule for 4,September. | |
| 09/17/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Bathroom in wall plumbing at Building #2; Level #4: Rooms 4214 - 4236; Building #1; Level #4, Rooms: 4101 - 4107, 4109 - 4113. | |
| 10/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 10-14-25: verified supports on pex lines in room's, 5101, 6106, 6107, 4101. Also verified the following showers under test in Building 2-room's 4103-4114, 4212-4224. Okay to continue with construction at progress areas. | |
| 12/03/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 12/3/2025 partial pass. Bathroom only 7th floor approved. Okay to proceed progress areas. | |
| 12/11/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 12/11/2025 partial pass. 6th floor approved. Okay to proceed progress areas. | |
| 12/23/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 12/23/25: plumbing in wall and electrical in wall approved in rooms 5575,5579,5577,5581,5583,5585,5587,5589,5591,5593,5592,5590,5588,5586,5584,5580,5582,5578,5576,5574, | |
| 12/31/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Partial pass. Suite number 5595 on 5th floor of building 5. Approved in wall and above ceiling. Okay to proceed process areas. 12/31/2025 |