Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
8815 E GOLF LINKS RD
Apply Date:
11/17/2023
Applicant:
Bruce Call
Description:
RADIANT GYMNASTICS - PHASE 2

Permit Reviews

Permit Number - TC-COM-1123-02689
Permit Status: Issued
Permit Description: RADIANT GYMNASTICS - PHASE 2
Start Date Submittal Complete Date Status  
06/06/2025 COMMERCIAL REVIEW - FULL v.4 06/09/2025 APPROVED Review Details
11/14/2025 COMMERCIAL REVIEW - FULL v.1 12/10/2025 APPROVED Review Details
05/12/2025 COMMERCIAL REVIEW - FULL v.3 06/04/2025 REQUIRES RESUBMIT Review Details
11/21/2023 COMMERCIAL REVIEW - FULL v.1 12/18/2023 REQUIRES RESUBMIT Review Details
06/09/2025 RESTAMP - COMMERCIAL v.1 06/20/2025 APPROVED Review Details
07/12/2024 COMMERCIAL REVIEW - FULL v.2 08/14/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1123-02689
Permit Status: Issued
Permit Description: RADIANT GYMNASTICS - PHASE 2
Total Outstanding Activity Conditions - 5
Date Name
07/15/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
07/15/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
07/15/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/15/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/15/2024 ??? Designs must be submitted and approved prior to ...

Conditions

Permit Number - TC-COM-1123-02689
Permit Status: Issued
Permit Description: RADIANT GYMNASTICS - PHASE 2
Date Description Comments
06/26/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-1123-02689
Permite Description: RADIANT GYMNASTICS - PHASE 2
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/01/2026 COT - HCPL - Backwater Valve N/A Not Applicable No backwater valve on plan.
07/01/2026 COT - HCBU - Building Above Ceiling N/A Partial Pass 7.1.26
1. Mech above ceiling pending, lay ceiling grid and install diffusers and support flex duct.
2. J box overladed just outside mop room above ceiling
03/20/2026 COT - HCBU - Interior Shear Bracing N/A Canceled work incomplete

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-1123-02689
Permit Description: RADIANT GYMNASTICS - PHASE 2
Total Completed Inspections - 17
Date Description Inspector Results Comments
07/25/2025 COT - HCPL - Rough Soil Passed
09/05/2025 COT - HCBU - Preslab Passed
03/20/2026 COT - HCBU - Building Progress Passed
03/20/2026 COT - HCBU - Roof Nailing Passed
04/24/2026 COT - HCEL - Electrical Underground Passed Passed 4/24/26
05/05/2026 COT - HCBU - Framing Passed Passed 5/5/26
06/26/2026 COT - HCPL - Plumbing Roof Drains Passed passed
06/26/2026 COT - HCEL - Electrical Above Ceiling Passed
06/26/2026 COT - HCME - Mechanical Intermediate Passed passed
06/26/2026 COT - HCME - Mechanical Above Ceiling Passed passed
07/01/2026 COT - HCEL - Electrical Intermediate Passed
07/01/2026 COT - HCBU - Interior Shear Bracing Passed
07/01/2026 COT - HCPL - Plumbing Intermediate Passed
07/01/2026 COT - HCPL - Sewer Passed
07/30/2026 COT - HCEL - Grounding/Bonding Passed
08/05/2026 BULD - Electrical Clearance Passed TEP CLEARANCE: ECO
08/11/2026 PDSD Building Division SIte Consultation Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SUB1_REV1_PLAN SET_RADIANT GYMNASTICS PHASE 2_V1.PDF DOCUMENTS VIEW
SUB2_GEOTECH ADDENDUM_RADIANT GYMNASTICS PHASE 2_V1.PDF DOCUMENTS VIEW
SUB2_GEOTECH VALIDATION_RADIANT GYMNASTICS PHASE 2_V1.PDF DOCUMENTS VIEW
SUB2_ORIGINAL GEOTECH_RADIANT GYMNASTICS PHASE 2_V1.PDF DOCUMENTS VIEW
SUB2_SPECIAL INSPECTION CERTIFICATE_RADIANT GYMNASTICS PHASE 2-2024-07-11_V1.PDF DOCUMENTS VIEW
SUB2_STRUCTURAL CALCULATIONS_RADIANT GYMNASTICS PHASE 2_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW