Permit Details

Status:
Complete
Type:
Commercial Building
Address:
7396 S NEXUS RD
Address NEW:
7396 S NEXUS RD
Apply Date:
11/16/2023
Applicant:
JASON GRECO
Description:
2nd Party - Proposed 9,109 square foot Early Childcare Facility with a 7,168 square foot outdoor playground.

Permit Reviews

Permit Number - TC-COM-1123-02681
Permit Status: Complete
Permit Description: 2nd Party - Proposed 9,109 square foot Early Childcare Facility with a 7,168 square foot outdoor playground.
Start Date Submittal Complete Date Status  
12/21/2023 COMMERCIAL REVIEW - FULL v.2 01/16/2024 REQUIRES RESUBMIT Review Details
05/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/03/2025 REQUIRES RESUBMIT Review Details
04/07/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/15/2025 REQUIRES RESUBMIT Review Details
02/13/2024 RESTAMP - COMMERCIAL v.1 02/26/2024 APPROVED Review Details
01/19/2024 COMMERCIAL REVIEW - FULL v.3 02/13/2024 APPROVED Review Details
06/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/24/2025 APPROVED Review Details
06/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 06/18/2025 APPROVED Review Details
11/20/2023 COMMERCIAL REVIEW - FULL v.1 12/15/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1123-02681
Permit Status: Complete
Permit Description: 2nd Party - Proposed 9,109 square foot Early Childcare Facility with a 7,168 square foot outdoor playground.
Date Description Comments
12/28/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
12/28/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/20/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/28/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/28/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
11/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/28/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/28/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02681
Permite Description: 2nd Party - Proposed 9,109 square foot Early Childcare Facility with a 7,168 square foot outdoor playground.
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
12/26/2024 COT - BULD - SWG Clearance N/A Re-inspection required 12-26-24, gauge for gas pressure test at 11 psi. Test shall be at 15psi for minimum of 10 minutes.
10/21/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass 10-21-24: PARTIAL PASS--Electrical wiring is complete in classrooms, hallway, office area, and restrooms. Sub-panels are not installed in interior electrical closet. Okay to insulate exterior walls floor to roof deck.
09/20/2024 BULD - Electrical Clearance N/A Not Ready
11/26/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 11/26/2024 inspection was called in for trash enclosure. Inspected by engineer inspector.
03/04/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass 3-4-25, tie in exhaust in pantry room, flex in classroom, and mc cable tie in to water heater at laundry room.
12/26/2024 COT - HCPL - Gas Final N/A Re-inspection required 12-26-24, gauge for gas pressure test at 11 psi. Test shall be at 15psi for minimum of 10 minutes.
COT - FCON - Sprinkler - Final N/A Not Ready
COT - FCON - Alarm - Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready
04/25/2025 COT - HCBU - Building Final N/A Partial Pass 4-25-25, building final approved-pending conditions & 3rd party outdoor lighting inspection. (Ok for level four TCO. EWS)
04/25/2025 COT - HCBU - TCO N/A Partial Pass 4-25-25-level 2 TCO(partial pass).
09/27/2024 COT - HCEL - Outdoor Lighting N/A Re-inspection required Light pole bases are not deep enough per plan.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02681
Permit Description: 2nd Party - Proposed 9,109 square foot Early Childcare Facility with a 7,168 square foot outdoor playground.
Total Completed Inspections - 29
Date Description Inspector Results Comments
08/08/2024 COT - HCBU - Preslab Passed
09/20/2024 COT - HCEL - Electrical Underground Passed 9/20/24: secondary service okay to back fill.
10/09/2024 COT - HCBU - Framing Passed 10/9/24: Interior walls are properly fire-blocked, all shear wall anchors are installed, and bottom plate bolts are installed with plate washers per plan. Okay to proceed with installation of insulation and drywall.
10/23/2024 COT - HCPL - Plumbing Intermediate Passed 10/23/24: plumbing rough-in is complete for DWV and hot/cold supply lines. Both systems are under water test.
10/23/2024 COT - HCPL - Plumbing Roof Drains Passed 10/23/24: Roof drains are installed and under a water test with no leaks. Okay to proceed.
01/02/2025 COT - BULD - SWG Clearance Passed Passed 1/2/25 CLEARANCE SWG
01/14/2025 COT - HCBU - Roof Nailing Passed 1-14-25, approved.
01/14/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed 1-14-24, was previously inspected and approved. All interior walls already taped.
01/29/2025 COT - HCME - Mechanical Above Ceiling Passed Above ceiling mechanical is complete. Okay to install perimeter ceiling tiles in all classrooms, staff break room, and front lobby.
01/29/2025 COT - HCPL - Plumbing Above Ceiling Passed Above ceiling plumbing is complete. Okay to install perimeter ceiling tiles in all classrooms, staff break room, and front lobby.
02/04/2025 COT - HCEL - Electrical Intermediate Passed
02/04/2025 BULD - Electrical Clearance Passed 2/4/25: TEP ECO CLEARANCE APPROVED FOR 7396 S NEXUS RD.
03/04/2025 COT - HCBU - Building Above Ceiling Passed
03/04/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
03/04/2025 COT - HCEL - Grounding/Bonding Passed 3-4-25, approved.
03/26/2025 COT - HCEL - Electrical Above Ceiling Passed
03/26/2025 COT - HCME - Mechanical Intermediate Passed
03/26/2025 COT - HCPL - Gas Final Passed
03/25/2025 COT - FCON - Sprinkler - Final Passed
04/02/2025 COT - HCME - Mechanical Final Passed 4-2-25, mechanical final approved.
04/02/2025 COT - HCEL - Electrical Final Passed 4-2-25, electrical final approved.
04/09/2025 COT - FCON - Alarm - Final Passed
04/09/2025 COT - FCON - Fire - Final Passed
04/10/2025 COT - HCPL - Plumbing Final Passed 4/10/2024 corrections were made. Chlorination report has been uploaded and in review.
04/10/2025 TRSP - ROW - Final/Close-Out Passed
04/25/2025 ENGR Engineering Final Passed
06/26/2025 COT - HCBU - Building Final Passed
06/26/2025 COT - HCBU - TCO Passed
06/26/2025 COT - HCEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE_TLE NEXUS _SIGNED MONRAD_22 MAY 2025_V1.PDF DOCUMENTS VIEW
RELEASE-FINAL LETTER OF COMPLIANCE - NEXUS - THE LEARNING EXPERIENCE (6-12-2025)_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
CONS-TLE TUCSON, AZ (NEXUS) - BUILDING SET_V3_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TLE TUCSON, AZ (NEXUS) - BUILDING SET_V3_V3.PDF DOCUMENTS VIEW