Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/28/2022
Applicant:
Description:
Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations.

Permit Reviews

Permit Number - TC-COM-1122-00184
Permit Status: Complete
Permit Description: Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations.
Start Date Submittal Complete Date Status  
04/25/2023 COMMERCIAL REVIEW - FULL v.4 04/26/2023 APPROVED Review Details
01/12/2023 COMMERCIAL REVIEW - FULL v.2 01/30/2023 REQUIRES RESUBMIT Review Details
02/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details
06/09/2023 COMMERCIAL REVIEW - FULL v.1 06/13/2023 APPROVED Review Details
04/26/2023 RESTAMP - COMMERCIAL v.1 04/27/2023 APPROVED Review Details
03/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/14/2024 APPROVED Review Details
12/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/29/2023 APPROVED Review Details
03/10/2023 COMMERCIAL REVIEW - FULL v.3 04/07/2023 REQUIRES RESUBMIT Review Details
12/07/2022 COMMERCIAL REVIEW - FULL v.1 01/12/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1122-00184
Permit Status: Complete
Permit Description: Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations.
Date Description Comments
04/07/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/27/2023 Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit.
04/07/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/07/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
12/28/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/06/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
03/06/2024 CONVEROR SYSTEM FOR SORTING AND LOADING OPERATIONS Designs must be submitted and approved prior to final.
12/28/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/06/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00184
Permite Description: Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/09/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
12/06/2023 COT - FCON - Alarm - Final N/A Partial Pass Fire pump flows and tampers approved. Strobes in Supervisors office and women's bathroom changed to horn/strobe, conveyors need to shut down per fire alarm plans sequence of operations. Add notification devices under the conveyors.
COT - FCON - Sprinkler - Final N/A Not Ready Sub did not call in his sprinkler permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00184
Permit Description: Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations.
Total Completed Inspections - 28
Date Description Inspector Results Comments
07/26/2023 COT - HCPL - Plumbing Progress Passed 7/26/23: Underground plumbing for vehicle wash area is installed from catch drain to outside of building were grease interceptor is going to be installed. Okay to shade and backfill/compact trench.
08/09/2023 COT - HCBU - Preslab Passed Pad for vehicle wash pit is properly dowed with rebar reinforcement, catch basin is installed, and subsoil is compacted. Okay to pour back concrete slab.
08/18/2023 COT - HCPL - Plumbing Intermediate Passed Plumbing rough-in is complete DWV Pipes are under water pressure test. Supply water lines are under compressed air pressure test and there are no leaks on either system. Okay to cover with drywall.
08/29/2023 BULD - Electrical Clearance Passed Suite 100 HPD, HPE, HPB, HPC, HPF. 6818 S country club. Clearance for TEP ECO. 8/29/2023
08/29/2023 COT - HCPL - Rough Soil Passed
09/18/2023 COT - HCBU - Interior Shear Bracing Passed 9/18/23: Control Room and Operations Room interior shear walls are properly screwed off per plans. Okay to tape, texture, and paint walls.
09/18/2023 COT - HCBU - Framing Passed 9/18/23: Framing for second floor mezzanine is complete. Okay to drywall both sides of walls, tape, texture, and paint. Dividing walls for vehicle repair are properly framed to below roof deck. Okay to drywall both sides of walls, tape, texture, and paint.
09/18/2023 COT - HCPL - Plumbing Above Ceiling Passed 9/18/23: Main plumbing lines are properly installed and under water test. Fire sprinkler lines are roughed in. All on the second floor of mezzanine. Vent pipes in walls for vehicle repair area are installed through the roof and under water test.
09/25/2023 COT - HCEL - Electrical Intermediate Passed 9/25/23: Electrical rough-in is complete on 1st floor mezzanine. Okay to insulate and sheet rock walls.
09/28/2023 COT - HCPL - Gas Pressure Test Passed Approved gas piping and pressure test to meter location
11/30/2023 COT - LCPL - Sewer Passed 11/15/23: oil-water separator connection to building per plan. Pending connection from Oil-water separator to manhole.
11/30/23: connection from oil-water separator to manhole per plan ok to back fill.
12/06/2023 COT - HCEL - Electrical Final Passed 12/4/23: passed all interior electrical. Pending rooftop.
12/5/23: passed
12/18/2023 COT - BULD - SWG Clearance Passed 12/18/23: SWG Clearance
12/18/2023 COT - HCPL - Gas Final Passed
02/09/2024 COT - HCME - Mechanical Final Passed
02/09/2024 COT - HCPL - Plumbing Final Passed
02/09/2024 COT - HCEL - Electrical Above Ceiling Passed
02/09/2024 COT - HCME - Mechanical Above Ceiling Passed
02/09/2024 COT - HCEL - Electrical Progress Passed
02/09/2024 COT - HCME - Mechanical Intermediate Passed
02/09/2024 COT - HCME - Mechanical Progress Passed
03/05/2024 TRSP - ROW - Final/Close-Out Passed
03/05/2024 COT - FCON - Alarm - Final Passed
03/06/2024 COT - FCON - Sprinkler - Final Passed
03/06/2024 COT - FCON - Fire - Final Passed
03/08/2024 ENGR Engineering Final Passed
03/08/2024 COT - HCBU - Building Final Passed 3/8/24: CofO Passed. Unsatisfied Conditions are on separate permit.
03/14/2024 COT - HCBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
TAC2 BLDG A - UPS TI SPECIAL INSP CLARIFICATION LTR 3-11-24_V1.PDF DOCUMENTS VIEW
SUBMITTAL RESPONSE_T-B-001_TEST AND BALANCE REPORT 02-23-24_V1.PDF DOCUMENTS VIEW
CONS-REV-1 PERMIT SET_V1 (1)_V1.PDF DOCUMENTS VIEW
23-053M TUCSON AIRPORT CNTR. UPS TI, SP. IN. CERT FINAL-2023-12-28_V1.PDF DOCUMENTS VIEW
CATALINA MECH. - UPS T.I. CHLORINATION REPORT-2023-12-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
001 ELECTRICAL REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
003 ELECTRICAL SHEETS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV-1 PERMIT SET_V1 (1)_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS_V1_V1.PDF DOCUMENTS VIEW
TAC2A UPS TI STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW