Inspection Status: Passed
Inspection History: COT - HCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 07/05/2023 |
COT - HCBU - Framing |
|
Passed |
Roof framing for HVAC equipment curbs is properly installed per building plans. |
| 09/06/2023 |
COT - HCBU - Framing |
|
Passed |
partial for offices and control room |
| 09/18/2023 |
COT - HCBU - Framing |
|
Passed |
9/18/23: Framing for second floor mezzanine is complete. Okay to drywall both sides of walls, tape, texture, and paint. Dividing walls for vehicle repair are properly framed to below roof deck. Okay to drywall both sides of walls, tape, texture, and paint. |