Permit: TC-COM-1122-00167
Permit Details
Apply Date:
11/23/2022
Applicant:
Colton Lloyd
Description:
The scope of work consists of an Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
Permit Reviews
Permit Number - TC-COM-1122-00167
Permit Status: Complete
Permit Description: The scope of work consists of an Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/08/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/17/2023 | REQUIRES RESUBMIT |
| 10/27/2023 | COMMERCIAL REVIEW - FULL v.3 | 10/31/2023 | APPROVED |
| 07/19/2024 | RESTAMP - COMMERCIAL v.1 | 07/23/2024 | APPROVED |
| 03/25/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/27/2026 | APPROVED |
| 07/03/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/19/2024 | APPROVED |
| 01/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/27/2026 | APPROVED |
| 06/05/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/26/2023 | REQUIRES RESUBMIT |
| 03/17/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/03/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1122-00167
Permit Status: Complete
Permit Description: The scope of work consists of an Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
| Date | Description | Comments |
|---|---|---|
| 06/20/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 08/14/2023 | Certificate of Occupancy shall not be issued until all abandonment and recordation information for existing and proposed electrical easements are provided. | |
| 06/20/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 06/20/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 06/20/2023 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00167
Permite Description: The scope of work consists of an Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 10/4/24: electrical in-wall at fitness room per plan, ok to proceed. |
| 12/27/2024 | COT - HCBU - Building Progress | N/A | Partial Pass | 12/27/2024 Reinforcement per plan. Final lift at south wall. Okay to grout progress areas. |
| 03/04/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 12/09/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 12/9/24: Room 110 Laundry Room plumbers have completed connections to the hot/cold water supply lines for washing machine box. Okay to insulate and drywall walls. |
| 03/20/2025 | COT - HCBU - Building Final | N/A | Not Ready | corrections have not been completed |
| 10/09/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/22/2025 | COT - FCON - Alarm - Final | N/A | Not Applicable | No fire alarm in building. There is a gas detection system for CO and NO2. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00167
Permit Description: The scope of work consists of an Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2024 | COT - HCPL - Rough Soil | Passed | 8/22/24: okay to backfill east side of building | |
| 10/04/2024 | COT - HCBU - Framing | Passed | 10/4/24: framing at Fitness room per plan ok to proceed. | |
| 10/25/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical rough-in above ceiling is complete and boxes are properly labeled with circuit information. | |
| 10/25/2024 | COT - HCME - Mechanical Above Ceiling | Passed | Mini-split unit is installed in ceiling and roughed in for condenser lines to exterior of building where unit will be installed, electrical wiring is installed for mini-split unit. | |
| 12/09/2024 | COT - HCBU - Preslab | Passed | 12/9/24: Vapor barrier is properly installed and rebar reinforcement is in place with dobies supporting it off of ground, plumbing pipes are properly wrapped with foam on the east side of building. Okay to pour concrete slab. | |
| 12/20/2024 | COT - HCBU - Masonry Pregrout | Passed | 12/20/24, rebar verified at 24"o/c for North wall. Okay to grout 3rd course at 13 feet. | |
| 01/15/2025 | COT - HCEL - Electrical Intermediate | Passed | 1/15/25: Electrical sub panel installed in room 101, rough in of electrical conduit and boxes is complete in rooms 101, 102, & 103. Okay to proceed with installation of insulation and drywall in these areas. | |
| 01/15/2025 | COT - HCPL - Plumbing Intermediate | Passed | Plumbing rough in is complete in room 103 for laundry tub, washing machine, and hot water heater. Okay to proceed with installation of insulation and drywall in this area. | |
| 01/15/2025 | COT - LCPL - Plumbing Roof Drains | Passed | Main roof drains and overflow drains are complete and under water test with no leaks. Okay to proceed with roofing of addition. | |
| 02/19/2025 | COT - HCBU - Building Progress | Passed | 2/19/25: Mechanical, electrical, and plumbing work is complete above ceiling. Okay to proceed with ceiling tile installation. | |
| 03/20/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 03/20/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 03/20/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 10/09/2025 | COT - HCBU - Building Final | Passed | ||
| 10/09/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 10/09/2025 | COT - HCEL - Electrical Final | Passed | ||
| 10/09/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 10/09/2025 | COT - HCME - Mechanical Final | Passed | ||
| 10/09/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 10/09/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 10/09/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 10/09/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 10/22/2025 | COT - FCON - Fire - Final | Passed | A report was provided for the gas detection system showing calibration and no deficiencies. Report added to files. | |
| 11/21/2025 | ENGR Engineering Final | Passed | ||
| 11/24/2025 | TRSP - ROW - Final/Close-Out | Passed | Work is complete |