Permit: TC-COM-1122-00166
Permit Details
Apply Date:
11/23/2022
Applicant:
Howard Smith
Description:
Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
Permit Reviews
Permit Number - TC-COM-1122-00166
Permit Status: Complete
Permit Description: Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 04/01/2025 | REQUIRES RESUBMIT |
| 12/08/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/10/2023 | REQUIRES RESUBMIT |
| 04/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/28/2025 | APPROVED |
| 05/22/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/06/2023 | APPROVED |
| 04/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.5 | 04/14/2025 | REQUIRES RESUBMIT |
| 12/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/30/2024 | APPROVED |
| 02/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/07/2025 | APPROVED |
| 03/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/10/2025 | REQUIRES RESUBMIT |
| 03/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 03/17/2025 | REQUIRES RESUBMIT |
| 02/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/27/2025 | REQUIRES RESUBMIT |
| 04/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.6 | 04/15/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1122-00166
Permit Status: Complete
Permit Description: Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
| Date | Description | Comments |
|---|---|---|
| 05/31/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/31/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 05/31/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00166
Permite Description: Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/25/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 10/28/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | |
| 10/28/2024 | COT - HCME - Mechanical Progress | N/A | Partial Pass | Phase One |
| 10/28/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Phase One |
| 12/09/2024 | COT - HCEL - Electrical Final | N/A | Partial Pass | This inspection is for an electric intermediate; bedroom near fitness room. Ok to insulate and cover walls. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00166
Permit Description: Interior Remodel, Two Additions, and Exterior Improvements of an existing free-standing fire station building.
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 07/17/2024 | COT - HCPL - Rough Soil | Passed | ||
| 08/20/2024 | COT - HCBU - Building Progress | Passed | ||
| 09/18/2024 | COT - HCBU - Roof Nailing | Passed | ||
| 09/25/2024 | COT - HCPL - Plumbing Progress | Passed | ||
| 09/25/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 09/25/2024 | COT - HCBU - Framing | Passed | ||
| 09/25/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 10/02/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 10/02/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 11/08/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 11/08/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 11/08/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 11/08/2024 | COT - HCME - Mechanical Progress | Passed | ||
| 11/08/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 12/03/2024 | COT - HCME - Mechanical Final | Passed | ||
| 12/27/2024 | ENGR Engineering Final | Passed | Either hydroseed or DG must cover disturbed surfaces for erosion protection. This includes basins and areas around them (Dirt) that were disturbed by construction activity. | |
| 12/27/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 12/27/2024 | COT - HCPL - Plumbing Final | Passed | 12/27/2024. Corrections were made. | |
| 01/17/2025 | COT - HCBU - Building Final | Passed | 1-17-25, building final approved. | |
| 01/17/2025 | COT - FCON - Fire - Final | Passed | ||
| 01/31/2025 | TRSP - ROW - Final/Close-Out | Passed |