Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/27/2024 |
ENGR Engineering Final
|
|
Passed |
Either hydroseed or DG must cover disturbed surfaces for erosion protection. This includes basins and areas around them (Dirt) that were disturbed by construction activity. |