Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/09/2022
Applicant:
Patrick Carty
Description:
Providing (2) Type 2B constructed canopies to the North and West of existing building. Canopies are not attached to existing building/canopy structure.

Permit Reviews

Permit Number - TC-COM-1122-00082
Permit Status: Complete
Permit Description: Providing (2) Type 2B constructed canopies to the North and West of existing building. Canopies are not attached to existing building/canopy structure.
Start Date Submittal Complete Date Status  
03/01/2023 COMMERCIAL REVIEW - FULL v.4 03/02/2023 REQUIRES RESUBMIT Review Details
11/29/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/05/2023 APPROVED Review Details
11/21/2022 COMMERCIAL REVIEW - FULL v.1 12/23/2022 REQUIRES RESUBMIT Review Details
03/02/2023 COMMERCIAL REVIEW - FULL v.5 03/24/2023 REQUIRES RESUBMIT Review Details
03/24/2023 COMMERCIAL REVIEW - FULL v.6 03/29/2023 APPROVED Review Details
02/18/2023 COMMERCIAL REVIEW - FULL v.2 02/18/2023 REQUIRES RESUBMIT Review Details
03/01/2023 COMMERCIAL REVIEW - FULL v.3 03/01/2023 IN REVIEW Review Details
03/29/2023 RESTAMP - COMMERCIAL v.1 03/29/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-1122-00082
Permit Status: Complete
Permit Description: Providing (2) Type 2B constructed canopies to the North and West of existing building. Canopies are not attached to existing building/canopy structure.
Date Description Comments
03/13/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/13/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00082
Permite Description: Providing (2) Type 2B constructed canopies to the North and West of existing building. Canopies are not attached to existing building/canopy structure.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
05/31/2023 COT - HCBU - Framing N/A Partial Pass Steel columns are bolted to concrete column footings, roof beams are installed with purlins properly attached. Okay to install metal roofing material. Special inspector has been onsite and approved structure.
05/31/2023 COT - HCBU - Building Progress N/A Partial Pass Steel columns are bolted to concrete column footings, roof beams are installed with purlins properly attached. Okay to install metal roofing material. Special inspector has been onsite and approved structure.
08/17/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Column line C8. Okay for concrete placement in 4 (7B) footings. Rebar per plans. 4/27/2023

Column lines C8 - CA and CFand C9 - CA, CB, CC, CD,CE and CF. Okay for concrete placement in columns. 5/11/2023

Canceled. Inspection is due to backfill, compaction for driveway expansion and new curb. 5/16/2023

CH line C7- C5. CG line C7 - C4 per plan okay for concrete placement in footings 8/10/2023

CH line C1 - C4. CG line C1 - C3 rebar per plan okay for concrete placement in footings. 8/11/2023

CH line C4 - C7 per plan okay for concrete placement in pedestals. CG line C4 -C7 rebar per plan okay for concrete placement in pedestal 8/15/2023

8/17/23: CH line C1-C3 per plan okay for concrete placement in pedestals. CG line C1-C3 per plan okay for concrete placement in pedestals.
05/08/2023 COT - HCBU - Preslab N/A Partial Pass Column footings for 6 columns on GL: C.9/A - F. OK to place concrete in progress areas.
06/27/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass J-Boxes in ceiling area in place. Lighting to be attached at a later date.
06/27/2023 COT - HCEL - Electrical Progress N/A Partial Pass Wiring for new lighting has been pulled and is in place. Awaiting shipment of lights.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00082
Permit Description: Providing (2) Type 2B constructed canopies to the North and West of existing building. Canopies are not attached to existing building/canopy structure.
Total Completed Inspections - 14
Date Description Inspector Results Comments
11/09/2023 COT - HCBU - Building Final Passed
11/09/2023 COT - HCBU - Roof Nailing Passed
11/09/2023 COT - HCEL - Electrical Final Passed
11/09/2023 COT - HCBU - Building Progress Passed
11/09/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
11/09/2023 COT - HCBU - Preslab Passed
11/09/2023 COT - HCEL - Outdoor Lighting Passed
11/09/2023 COT - HCEL - Electrical Intermediate Passed
11/09/2023 COT - HCEL - Electrical Progress Passed
11/09/2023 COT - HCEL - Electrical Underground Passed
11/13/2023 COT - FCON - Fire - Final Passed
11/15/2023 BULD - Electrical Clearance Passed No clearance required
11/15/2023 COT - BULD - SWG Clearance Passed NO CLEARANCE REQUIRED.
11/16/2023 PDSD Engineering Division Pre-Construction SITE Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
TC-COM-1122-00082.DTU2 CANOPY ADDITIONS. SI CERT-2023-11-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CANOPY ADDITION PLAN_V1_V1.PDF DOCUMENTS VIEW
CALCS_V1.PDF DOCUMENTS VIEW
CALCS_V1_V1.PDF DOCUMENTS VIEW
CANOPY ADDITION PLAN_V1.PDF DOCUMENTS VIEW
NARRATIVE_V1 (2)_V1.PDF DOCUMENTS VIEW
NARRATIVE_V1.PDF DOCUMENTS VIEW