Permit: TC-COM-1024-02053
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3302 E SPEEDWAY BL
Address NEW:
3302 E SPEEDWAY BL
Apply Date:
10/24/2024
Applicant:
jake reyes
Description:
EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
Permit Reviews
Permit Number - TC-COM-1024-02053
Permit Status: Complete
Permit Description: EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN,
NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE
TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED
TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL
PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2).
THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE
OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE
EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE
AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL
APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO
UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL
STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH
COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT
CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING
COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED
(WOOD FRAMED PARAPETS AND STUCCO FINISH).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/22/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/10/2024 | APPROVED |
| 12/10/2024 | RESTAMP - COMMERCIAL v.1 | 12/12/2024 | APPROVED |
| 10/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2025 | APPROVED |
| 10/29/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/21/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1024-02053
Permit Status: Complete
Permit Description: EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN,
NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE
TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED
TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL
PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2).
THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE
OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE
EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE
AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL
APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO
UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL
STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH
COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT
CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING
COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED
(WOOD FRAMED PARAPETS AND STUCCO FINISH).
| Date | Description | Comments |
|---|---|---|
| 12/03/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 12/12/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 12/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 12/03/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 12/03/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 12/03/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 12/03/2024 | Masonry Inspection Report submittal review is required. | |
| 11/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/03/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02053
Permite Description: EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN,
NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE
TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED
TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL
PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2).
THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE
OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE
EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE
AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL
APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO
UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL
STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH
COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT
CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING
COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED
(WOOD FRAMED PARAPETS AND STUCCO FINISH).
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | Inspected: Detail 16 on S1.3 footer and rebar for site wall on south east corner of property. Detail 4.05 on A0.01 |
| 09/26/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 09/26/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/26/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Not Applicable | |
| 09/26/2025 | COT - HCEL - Electrical Final | N/A | Re-inspection required | Provide printed panel schedule at all house panels and timers. Label all j boxes at access points. Provide ko seals at j boxes. 9/26/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-02053
Permit Description: EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN,
NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE
TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED
TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL
PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2).
THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE
OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE
EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE
AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL
APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO
UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL
STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH
COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT
CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING
COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED
(WOOD FRAMED PARAPETS AND STUCCO FINISH).
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | COT - HCBU - Framing | Passed | ||
| 03/14/2025 | COT - HCBU - Building Progress | Passed | Dry pack on columns. | |
| 04/08/2025 | COT - HCEL - Electrical Progress | Passed | Electric underground for bollard lights; Ok to,cover progress areas. | |
| 09/26/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 09/26/2025 | COT - HCBU - Masonry Pregrout | Passed | ||
| 10/20/2025 | COT - HCBU - Building Final | Passed | ||
| 10/20/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 10/20/2025 | ENGR Engineering Final | Passed | ||
| 10/20/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 10/20/2025 | COT - HCBU - CofO | Passed | Pending Fire Finals. | |
| 10/20/2025 | COT - HCEL - Electrical Final | Passed | ||
| 10/20/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 10/27/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/27/2025 | COT - FCON - Sprinkler - Final | Passed |