Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: TC-COM-1024-02053
Activity
Permits
Date - 12/25/2024 4:48 p.m.
Number Of Permits - (13)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). | |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 100 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 102 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 104 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 108 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 110 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 112 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 200 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 202 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 204 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 206 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 210 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 212 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |