Permit: TC-COM-1024-01978
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2562 N ALVERNON WY
Address NEW:
2562 N ALVERNON WY
Apply Date:
10/15/2024
Applicant:
Annette Suarez
Description:
remodel in an existing building
Permit Reviews
Permit Number - TC-COM-1024-01978
Permit Status: Complete
Permit Description: remodel in an existing building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | APPROVED |
| 01/08/2025 | COMMERCIAL REVIEW - FULL v.3 | 01/27/2025 | APPROVED |
| 01/27/2025 | RESTAMP - COMMERCIAL v.1 | 01/29/2025 | APPROVED |
| 12/02/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/22/2024 | REQUIRES RESUBMIT |
| 08/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/18/2025 | APPROVED |
| 02/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/06/2025 | APPROVED |
| 10/18/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/12/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1024-01978
Permit Status: Complete
Permit Description: remodel in an existing building
| Date | Description | Comments |
|---|---|---|
| 01/10/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 01/10/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 01/08/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/10/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 11/05/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-01978
Permite Description: remodel in an existing building
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - HCME - Venting | N/A | Not Applicable | |
| 05/09/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Applicable | |
| 09/17/2025 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 09/17/2025 | COT - HCEL - Grounding/Bonding | N/A | Not Applicable | |
| COT - FCON - Alarm - Final | N/A | Not Ready | ||
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| 09/22/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1024-01978
Permit Description: remodel in an existing building
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - HCBU - Framing | Passed | ||
| 05/09/2025 | COT - HCEL - Electrical Progress | Passed | Intermediate | |
| 05/09/2025 | COT - HCME - Mechanical Progress | Passed | Intermediate | |
| 05/09/2025 | COT - HCPL - Plumbing Progress | Passed | Intermediate | |
| 06/26/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 6-26-25: electrical above ceiling approved. Okay to continue construction at progress areas. | |
| 06/26/2025 | COT - HCME - Mechanical Above Ceiling | Passed | 6-26-25: mechanical above ceiling approved. Okay to install ceiling tiles. | |
| 06/26/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | 6-26-25: plumbing above ceiling approved. Okay to continue construction at progress areas. | |
| 07/01/2025 | BULD - Electrical Clearance | Passed | Approved new 200A 3-phase service panel at existing CT can - ECO Clearance to TEP is required for "Meter #2" | |
| 09/17/2025 | COT - HCBU - Preslab | Passed | ||
| 09/17/2025 | COT - HCBU - Sustainability | Passed | ||
| 09/18/2025 | COT - FCON - Alarm - Final | Passed | ||
| 09/18/2025 | COT - FCON - Fire - Final | Passed | ||
| 09/22/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/22/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 09/22/2025 | COT - HCBU - Building Progress | Passed | ||
| 09/23/2025 | COT - HCBU - CofO | Passed | ||
| 09/23/2025 | COT - HCBU - Building Final | Passed | ||
| 09/23/2025 | COT - HCEL - Electrical Final | Passed | ||
| 09/23/2025 | COT - HCME - Mechanical Final | Passed | ||
| 09/23/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 09/24/2025 | ENGR Engineering Final | Passed |