Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1024-01962
Permit Details
Apply Date:
10/11/2024
Applicant:
Geordon Seaver
Description:
The scope of this project consists of the following: 1. New Peds ED will occupy approximately 7,910 SF of the existing shell space. 2. The total remodeled area of existing ED is about 5,470 SF. 3. Separate Peds from Adults Entrance, Vestibule and Waiting. 4. The new Peds ED to be comprised of the following: a. (22) Treatments rooms. b. (1) Isolation/Treatment room with private TLT. c. (1) Play / Observation space with a family TLT. d. (1) Centrally located Nurse Station. e. Dictation space, adjacent to the Nurse Station, with room for (5) workstations. f. Support spaces as required by the program. 5. A new Peds Waiting Room to accommodate up to 32 visitors 6. The existing Waiting Room will expand to accommodate up to 60 visitors for Adult ED. 7. New registration will be placed between the two new Waiting Spaces. 8. The new result waiting will accommodate up to 18 patients. 9. Additional Toilets will be provided to meet code requirement.
Permit Reviews
Permit Number - TC-COM-1024-01962
Permit Status: Inspections
Permit Description: The scope of this project consists of the following:
1. New Peds ED will occupy approximately 7,910 SF of the existing shell space.
2. The total remodeled area of existing ED is about 5,470 SF.
3. Separate Peds from Adults Entrance, Vestibule and Waiting.
4. The new Peds ED to be comprised of the following:
a. (22) Treatments rooms.
b. (1) Isolation/Treatment room with private TLT.
c. (1) Play / Observation space with a family TLT.
d. (1) Centrally located Nurse Station.
e. Dictation space, adjacent to the Nurse Station, with room for (5) workstations.
f. Support spaces as required by the program.
5. A new Peds Waiting Room to accommodate up to 32 visitors
6. The existing Waiting Room will expand to accommodate up to 60 visitors for Adult ED.
7. New registration will be placed between the two new Waiting Spaces.
8. The new result waiting will accommodate up to 18 patients.
9. Additional Toilets will be provided to meet code requirement.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/12/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/07/2025 | REQUIRES RESUBMIT |
02/11/2025 | RESTAMP - COMMERCIAL v.1 | 02/13/2025 | APPROVED |
10/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/21/2024 | REQUIRES RESUBMIT |
02/04/2025 | COMMERCIAL REVIEW - FULL v.4 | 02/11/2025 | APPROVED |
01/27/2025 | COMMERCIAL REVIEW - FULL v.3 | 01/31/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1024-01962
Permit Status: Inspections
Permit Description: The scope of this project consists of the following:
1. New Peds ED will occupy approximately 7,910 SF of the existing shell space.
2. The total remodeled area of existing ED is about 5,470 SF.
3. Separate Peds from Adults Entrance, Vestibule and Waiting.
4. The new Peds ED to be comprised of the following:
a. (22) Treatments rooms.
b. (1) Isolation/Treatment room with private TLT.
c. (1) Play / Observation space with a family TLT.
d. (1) Centrally located Nurse Station.
e. Dictation space, adjacent to the Nurse Station, with room for (5) workstations.
f. Support spaces as required by the program.
5. A new Peds Waiting Room to accommodate up to 32 visitors
6. The existing Waiting Room will expand to accommodate up to 60 visitors for Adult ED.
7. New registration will be placed between the two new Waiting Spaces.
8. The new result waiting will accommodate up to 18 patients.
9. Additional Toilets will be provided to meet code requirement.
Total Outstanding Activity Conditions - 18
Date | Name |
---|---|
02/11/2025 | AIR BALANCING REPORT IS REQUIRED. |
02/11/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
02/11/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
02/11/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR MEDICAL GASES IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR SMOKE CONTROL SYSTEM IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
02/11/2025 | STATE FIRE MARSHAL INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION |
02/11/2025 | STATE HEALTH LICENSE REQUIRED - PLEASE PROVIDE DOCUMENTATION. |
02/11/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
02/21/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
02/21/2025 | A SPECIAL INSPECTIONS INTERMEDIATE CERTIFICATE MUST BE SUBMITTED AND REVIEWED PRIOR TO ISSUANCE OF THIS PERMIT |
Conditions
Permit Number - TC-COM-1024-01962
Permit Status: Inspections
Permit Description: The scope of this project consists of the following:
1. New Peds ED will occupy approximately 7,910 SF of the existing shell space.
2. The total remodeled area of existing ED is about 5,470 SF.
3. Separate Peds from Adults Entrance, Vestibule and Waiting.
4. The new Peds ED to be comprised of the following:
a. (22) Treatments rooms.
b. (1) Isolation/Treatment room with private TLT.
c. (1) Play / Observation space with a family TLT.
d. (1) Centrally located Nurse Station.
e. Dictation space, adjacent to the Nurse Station, with room for (5) workstations.
f. Support spaces as required by the program.
5. A new Peds Waiting Room to accommodate up to 32 visitors
6. The existing Waiting Room will expand to accommodate up to 60 visitors for Adult ED.
7. New registration will be placed between the two new Waiting Spaces.
8. The new result waiting will accommodate up to 18 patients.
9. Additional Toilets will be provided to meet code requirement.
Date | Description | Comments |
---|---|---|
02/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/27/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1024-01962
Permite Description: The scope of this project consists of the following:
1. New Peds ED will occupy approximately 7,910 SF of the existing shell space.
2. The total remodeled area of existing ED is about 5,470 SF.
3. Separate Peds from Adults Entrance, Vestibule and Waiting.
4. The new Peds ED to be comprised of the following:
a. (22) Treatments rooms.
b. (1) Isolation/Treatment room with private TLT.
c. (1) Play / Observation space with a family TLT.
d. (1) Centrally located Nurse Station.
e. Dictation space, adjacent to the Nurse Station, with room for (5) workstations.
f. Support spaces as required by the program.
5. A new Peds Waiting Room to accommodate up to 32 visitors
6. The existing Waiting Room will expand to accommodate up to 60 visitors for Adult ED.
7. New registration will be placed between the two new Waiting Spaces.
8. The new result waiting will accommodate up to 18 patients.
9. Additional Toilets will be provided to meet code requirement.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | |
03/03/2025 | COT - HCBU - Building Progress | N/A | Partial Pass |