Permit: TC-COM-1024-01900
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
100 S SARNOFF DR
Address NEW:
100 S SARNOFF DR
Apply Date:
10/01/2024
Applicant:
Gabe Torres
Description:
An exterior remodel of an existing Dairy Queen Building. No interior work
Permit Reviews
Permit Number - TC-COM-1024-01900
Permit Status: Needs resubmittal
Permit Description: An exterior remodel of an existing Dairy Queen Building. No interior work
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/11/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/03/2025 | APPROVED |
| 10/07/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/08/2024 | REQUIRES RESUBMIT |
| 03/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/25/2025 | APPROVED |
| 11/14/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/08/2025 | APPROVED |
| 03/16/2026 | SPECIAL INSPECTION REVIEW v.3 | N/A | IN REVIEW |
| 03/05/2026 | SPECIAL INSPECTION REVIEW v.2 | 03/05/2026 | REQUIRES RESUBMIT |
| 01/09/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/31/2025 | REQUIRES RESUBMIT |
| 03/03/2025 | RESTAMP - COMMERCIAL v.1 | 03/10/2025 | APPROVED |
| 02/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 02/26/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1024-01900
Permit Status: Needs resubmittal
Permit Description: An exterior remodel of an existing Dairy Queen Building. No interior work
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/27/2025 | SPECIAL INSPECTION FOR EPOXY BOLTS AND DOWELS REQUIRED. |
| 01/27/2025 | SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED. |
Conditions
Permit Number - TC-COM-1024-01900
Permit Status: Needs resubmittal
Permit Description: An exterior remodel of an existing Dairy Queen Building. No interior work
| Date | Description | Comments |
|---|---|---|
| 10/07/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/27/2025 | SPECIAL INSPECTION OF STRUCTURAL FABRICATOR: STRUCTURAL INSPECTION OF STEEL FABRICATOR IS REQUIRED IF THE FABRICATOR IS NOT ON THE CITY OF TUCSON APPROVED LIST OF FABRICATORS OR IF CITY DOES NOT HAVE AN APPROVED LIST | |
| 02/11/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/06/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 01/27/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-1024-01900
Permite Description: An exterior remodel of an existing Dairy Queen Building. No interior work
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/10/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 02/10/2026 | COT - LCME - Mechanical Final | N/A | Not Applicable | |
| 02/10/2026 | COT - LCPL - Plumbing Final | N/A | Not Applicable | |
| 02/10/2026 | COT - LCPL - Plumbing Roof Drains | N/A | Not Applicable | |
| 03/02/2026 | COT - LCBU - Masonry Pregrout | N/A | Not Applicable |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-1024-01900
Permit Description: An exterior remodel of an existing Dairy Queen Building. No interior work
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2025 | COT - LCBU - Preslab | Passed | Passed 10/29/25 ok to set beams and pour | |
| 11/18/2025 | COT - LCBU - Framing | Passed | ||
| 11/20/2025 | COT - LCBU - Roof Nailing | Passed | ||
| 12/10/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 12/12/2025 | COT - LCBU - Building Progress | Passed | Passed 12/12/25 | |
| 12/22/2025 | BULD - Electrical Clearance | Passed | Passed 12/22/25 CLEARANCE INCR called Marcia 8:08 to restore power | |
| 02/10/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 02/10/2026 | COT - LCEL - Outdoor Lighting | Passed | ||
| 02/10/2026 | COT - LCBU - Building Final | Passed | ||
| 02/10/2026 | COT - LCEL - Electrical Final | Passed | ||
| 02/11/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 02/11/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/02/2026 | COT - FCON - Fire - Final | Passed |