Permit: TC-COM-0924-01780
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
3301 E GLOBAL LP
Address NEW:
3301 E GLOBAL LP
Apply Date:
09/12/2024
Applicant:
James Lynch
Description:
Removal of existing parking spaces and addition of new concrete slab and fence with new exterior genrator. update to existing SES. No change to the existing occupancy or area of the existing building.
Permit Reviews
Permit Number - TC-COM-0924-01780
Permit Status: Inspections
Permit Description: Removal of existing parking spaces and addition of new concrete slab and fence with new exterior genrator. update to existing SES. No change to the existing occupancy or area of the existing building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 01/14/2025 | APPROVED |
| 09/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 10/16/2024 | REQUIRES RESUBMIT |
| 10/29/2024 | RESTAMP - COMMERCIAL v.1 | 11/01/2024 | APPROVED |
| 10/23/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/29/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0924-01780
Permit Status: Inspections
Permit Description: Removal of existing parking spaces and addition of new concrete slab and fence with new exterior genrator. update to existing SES. No change to the existing occupancy or area of the existing building.
| Date | Description | Comments |
|---|---|---|
| 09/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0924-01780
Permite Description: Removal of existing parking spaces and addition of new concrete slab and fence with new exterior genrator. update to existing SES. No change to the existing occupancy or area of the existing building.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2025 | COT - HCBU - Preslab | N/A | Partial Pass | Pad for new CT can location per detail 103/S1.0 approved. Okay for concrete placement. 6/9/2025 |
| 06/09/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Pad for new CT can location per detail 103/S1.0 approved. Okay for concrete placement. 6/9/2025 |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0924-01780
Permit Description: Removal of existing parking spaces and addition of new concrete slab and fence with new exterior genrator. update to existing SES. No change to the existing occupancy or area of the existing building.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | COT - HCPL - Gas Pressure Test | Passed | 5-8-25, approximately 160' of 4" Schedule 40 conduit with tracer wire verified under test. Okay to backfill with shading materials. | |
| 05/12/2025 | COT - HCEL - Grounding/Bonding | Passed | Approved Grounding Ring 4/0 Cu with 6 Rods, okay to backfill progress areas | |
| 02/18/2026 | COT - HCEL - Electrical Progress | Passed | 2-18-26: approved. | |
| 02/18/2026 | COT - HCBU - Preslab | Passed | 2-18-26: previously inspected & approved. | |
| 02/18/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 2-18-26: previously inspected & approved. | |
| 02/18/2026 | COT - HCEL - Electrical Underground | Passed | 2-18-26: approved. | |
| 04/11/2026 | Building Inspection - Outside Normal Hours Building Inspection | Passed | 4-11-26: new Nema, 3R, 1000A-277/480V SES together with new natural generator installed per approved plans. Verbal INCR clearance to energize system given at 1416 hours. | |
| 04/11/2026 | BULD - Electrical Clearance | Passed | 4-11-26: new Nema, 3R, 1000A-277/480V SES together with new natural generator installed per approved plans. Verbal INCR clearance to energize system given at 1416 hours. | |
| 06/04/2026 | COT - HCEL - Electrical Final | Passed | 6-4-26: electrical final approved. |