Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Gas Pressure TestÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | COT - HCPL - Gas Pressure Test | Passed | 5-8-25, approximately 160' of 4" Schedule 40 conduit with tracer wire verified under test. Okay to backfill with shading materials. |