Permit: TC-COM-0924-01779
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
1315 W MIRACLE MILE
Address NEW:
1315 W MIRACLE MILE
Apply Date:
09/12/2024
Applicant:
RHONDA RAWSON
Description:
ADD STORAGE/WAREHOUSE AREA
Permit Reviews
Permit Number - TC-COM-0924-01779
Permit Status: Needs resubmittal
Permit Description: ADD STORAGE/WAREHOUSE AREA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | APPROVED |
| 09/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 10/15/2024 | REQUIRES RESUBMIT |
| 11/12/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/06/2024 | REQUIRES RESUBMIT |
| 01/08/2025 | RESTAMP - COMMERCIAL v.1 | 01/13/2025 | APPROVED |
| 12/15/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/08/2025 | APPROVED |
| 09/10/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 08/18/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/19/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0924-01779
Permit Status: Needs resubmittal
Permit Description: ADD STORAGE/WAREHOUSE AREA
| Date | Description | Comments |
|---|---|---|
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/14/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/14/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 08/21/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0924-01779
Permite Description: ADD STORAGE/WAREHOUSE AREA
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | |
| 04/22/2025 | COT - LCBU - Roof Nailing | N/A | Re-inspection required | Nailing and anchor bolts at shear walls not per schedule. Add jack studs at main entry. Loose sheathing throughout. Add vertical fire blocking at every 10´west wall. Add cs16 straps at exterior corner walls. Stopped inspection. 4/22/2025 |
| 05/16/2025 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | |
| 08/15/2025 | COT - LCEL - Electrical Final | N/A | Partial Pass | Ok for TCO level 4 on phase 1 |
| 08/15/2025 | COT - LCME - Mechanical Final | N/A | Partial Pass | Ok for TCO level 4 on phase 1 |
| 08/15/2025 | COT - LCPL - Plumbing Final | N/A | Partial Pass | Ok for TCO level 4 on phase 2 |
| 08/15/2025 | COT - LCBU - Building Final | N/A | Partial Pass | |
| 08/15/2025 | ENGR Engineering Final | N/A | Not Ready | Not Ready for Phase 3 Engineering Final… have applied for CO for phase 2 |
| 08/12/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 08/12/2026 | COT - LCEL - Outdoor Lighting | N/A | Not Ready |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0924-01779
Permit Description: ADD STORAGE/WAREHOUSE AREA
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2025 | COT - LCPL - Rough Soil | Passed | ||
| 12/17/2025 | COT - LCBU - Preslab | Passed | ||
| 01/27/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 01/27/2026 | COT - LCBU - Roof Nailing | Passed | ||
| 05/08/2026 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 07/06/2026 | COT - FCON - Fire - Final | Passed | ||
| 07/06/2026 | COT - LCEL - Electrical Final | Passed | ||
| 07/06/2026 | COT - LCME - Mechanical Final | Passed | ||
| 07/06/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 08/04/2026 | COT - LCBU - Building Final | Passed | ||
| 08/04/2026 | ENGR Engineering Final | Passed | Outstanding conditions to be satisfied: -epoxy anchors, and expansion anchors. Submit these report reports to the portal. |
|
| 08/04/2026 | TRSP - ROW - Notice of Completion | Passed | All work on private property no work in the right way | |
| 08/12/2026 | COT - LCEL - Grounding/Bonding | Passed | ||
| 08/11/2026 | COT - LCBU - Framing | Passed | 8.11.26 This is done. All Finals passed by Wayne G. On 8.4.26. |
|
| 08/12/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 08/11/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 8.11.26 This is done. All Finals passed by Wayne G. On 8.4.26. |
|
| 08/11/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/12/2026 | COT - HCBU - TCO | Passed | ||
| 08/11/2026 | COT - LCPL - Plumbing Intermediate | Passed | 8.11.26 This is done. All Finals passed by Wayne G. On 8.4.26. |
|
| 09/10/2026 | COT - LCEL - Outdoor Lighting | Passed |