Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2025 | ENGR Engineering Final | Partial Pass | This will approve for a level 4 TCO on the left side front building named per plan as Phase 2. | |
| 08/04/2026 | ENGR Engineering Final | Passed | Outstanding conditions to be satisfied: -epoxy anchors, and expansion anchors. Submit these report reports to the portal. |
|
| 08/15/2025 | ENGR Engineering Final | Not Ready | Not Ready for Phase 3 Engineering Final… have applied for CO for phase 2 |