Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
8535 E SPEEDWAY BL
Apply Date:
09/20/2023
Applicant:
Jon Sanders
Description:
Construction of a new 38,900 sf, single story retail building for Tractor Supply Company

Permit Reviews

Permit Number - TC-COM-0923-02247
Permit Status: Complete
Permit Description: Construction of a new 38,900 sf, single story retail building for Tractor Supply Company
Start Date Submittal Complete Date Status  
02/01/2024 COMMERCIAL REVIEW - FULL v.1 02/28/2024 REQUIRES RESUBMIT Review Details
12/28/2023 COMMERCIAL REVIEW - FULL v.4 01/03/2024 APPROVED Review Details
03/06/2024 COMMERCIAL REVIEW - FULL v.2 03/19/2024 APPROVED Review Details
08/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/12/2024 APPROVED Review Details
09/21/2023 COMMERCIAL REVIEW - FULL v.1 10/23/2023 REQUIRES RESUBMIT Review Details
03/19/2024 RESTAMP - COMMERCIAL v.1 03/20/2024 APPROVED Review Details
12/14/2023 COMMERCIAL REVIEW - FULL v.3 12/21/2023 REQUIRES RESUBMIT Review Details
01/03/2024 RESTAMP - COMMERCIAL v.1 01/05/2024 APPROVED Review Details
09/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/17/2024 APPROVED Review Details
11/07/2023 COMMERCIAL REVIEW - FULL v.2 12/01/2023 REQUIRES RESUBMIT Review Details
08/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/16/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0923-02247
Permit Status: Complete
Permit Description: Construction of a new 38,900 sf, single story retail building for Tractor Supply Company
Date Description Comments
11/15/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/15/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/12/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
11/15/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/15/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
11/15/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/15/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
11/15/2023 Masonry Inspection Report submittal review is required.
11/15/2023 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
01/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02247
Permite Description: Construction of a new 38,900 sf, single story retail building for Tractor Supply Company
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
03/08/2024 COT - HCEL - Electrical Underground N/A Partial Pass South parking lot.
04/18/2024 COT - HCBU - Preslab N/A Partial Pass Forage room.
02/27/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Interior pad footings.

Retail side.

Balance of building footings; light poles and site walls remain to be inspected.

2/27/24: 3rd lift (north,east,south) walls reinforcement per plan ok to proceed. Screen-wall at west and north end of property footings per plan ok to proceed.
08/01/2024 COT - HCME - Mechanical Final N/A Partial Pass pending resolution of conditions.
08/01/2024 COT - HCPL - Plumbing Final N/A Partial Pass pending resolution of conditions.
03/08/2024 COT - HCPL - Rough Soil N/A Partial Pass Retail side.
08/13/2024 COT - HCBU - Building Above Ceiling N/A Partial Pass pending resolution of conditions:
08/13/2024 COT - HCME - Mechanical Above Ceiling N/A Partial Pass pending resolution of conditions:
08/13/2024 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass pending resolution of conditions:
08/13/2024 COT - HCBU - Building Progress N/A Partial Pass pending resolution of the following conditions:

Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit.

Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.

Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-24-003 / P24SC00001 IS ACCEPTED AND RELEASED BY PCRWRD
08/13/2024 COT - HCBU - Roof Nailing N/A Partial Pass pending resolution of conditions: conditions met. EWS.
08/21/2024 COT - HCBU - TCO N/A Not Applicable Recommend issuing C of O.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02247
Permit Description: Construction of a new 38,900 sf, single story retail building for Tractor Supply Company
Total Completed Inspections - 27
Date Description Inspector Results Comments
02/16/2024 COT - HCEL - Electrical Progress Passed
03/21/2024 COT - HCPL - Yard Water Line Passed
04/12/2024 COT - HCEL - Electrical Underground Passed
04/25/2024 COT - HCPL - Plumbing Progress Passed Trench drains in garden center.
05/01/2024 COT - HCBU - Preslab Passed Garden center
05/28/2024 COT - HCBU - Excavation/Rebar/Zoning Passed Light pole bases.
06/14/2024 COT - HCPL - Sewer Passed
06/20/2024 COT - HCBU - Framing Passed
06/21/2024 COT - HCME - Mechanical Intermediate Passed
06/21/2024 COT - HCME - Mechanical Progress Passed
06/28/2024 COT - HCEL - Electrical Intermediate Passed
07/02/2024 COT - HCBU - Exterior Clips/Sheathing Passed
07/10/2024 COT - BULD - SWG Clearance Passed
08/01/2024 COT - HCEL - Electrical Final Passed pending resolution of conditions.
08/01/2024 COT - HCPL - Plumbing Intermediate Passed
08/01/2024 COT - HCPL - Rough Soil Passed
08/13/2024 BULD - Electrical Clearance Passed EV Charging Service
08/12/2024 COT - HCBU - Masonry Pregrout Passed
08/12/2024 COT - HCEL - Electrical Above Ceiling Passed
08/12/2024 COT - HCEL - Outdoor Lighting Passed
08/21/2024 COT - FCON - Alarm - Final Passed
08/21/2024 COT - FCON - Sprinkler - Final Passed
08/21/2024 COT - HCBU - Building Final Passed
08/21/2024 COT - FCON - Fire - Final Passed
08/26/2024 TRSP - ROW - Final/Close-Out Passed
09/09/2024 ENGR Engineering Final Passed
09/09/2024 COT - HCBU - CofO Passed 9/9/24: Construction is complete and owner has stocked all shelves in store. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
TSC TUCSON NE-TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
TSC TUCSON NE-WATER QUALITY REPORT-2024-08-14_V1.PDF DOCUMENTS VIEW
TC-COM-0923-02247 SPECIAL INSPECTION CERTIFICATE-2024-08-05_V1.PDF DOCUMENTS VIEW
CONS-TSC TUCSON NE-REV 4-COT REV 1_2_V2.PDF DOCUMENTS VIEW
TSC TUCSON NE-ASMEP REV 4-COMMENT RESPONSE LETTER-3.6.24_V1.PDF DOCUMENTS VIEW
CONS-TSC TUCSON NE-REV 4-COT REV 1_2_V2.PDF DOCUMENTS VIEW
TSC TUCSON NE-ASMEP REV 4-COMMENT RESPONSE LETTER-3.6.24_V1.PDF DOCUMENTS VIEW
CONS-CONS-TSC - NE TUCSON, AZ ARCH SET V3 12.13.23_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-TSC - NE TUCSON, AZ ARCH SET V3 12.13.23_V3.PDF DOCUMENTS VIEW