Permit: TC-COM-0825-01528
Permit Details
Apply Date:
08/13/2025
Applicant:
Andrew Venne
Description:
Remodel - TI
Permit Reviews
Permit Number - TC-COM-0825-01528
Permit Status: Complete
Permit Description: Remodel - TI
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/23/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/23/2026 | REQUIRES RESUBMIT |
| 02/27/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/03/2026 | APPROVED |
| 08/15/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 09/02/2025 | APPROVED |
| 09/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/30/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0825-01528
Permit Status: Complete
Permit Description: Remodel - TI
| Date | Description | Comments |
|---|---|---|
| 09/02/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/02/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 09/02/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 08/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/02/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01528
Permite Description: Remodel - TI
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2025 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
| 10/23/2025 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 11/24/2025 | COT - LCME - Kitchen Hood | N/A | Partial Pass | |
| 10/23/2025 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | splices need to be in a box, not buried in framed wall. |
| 02/19/2026 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 2-19-26: wrap hot side of water heater with R3 insulation, secure whips at rooftop and provide a UL listed pad for condenser at rooftop, install permanent labels on all disconnects. |
| 02/19/2026 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 2-19-26: install a gfci receptacle adjacent to water heater, disconnect must contain a permanent label, add permanent label to panel L1, provide permanent disconnect labels at rooftop-see NEC requirements for more information, install a weather resistant gfci receptacle together with a bubble cover at rooftop, secure whips on rooftop to where they are not lying directly on roof, provide a UL listed condenser pad at rooftop, missing light fixture at exterior back door |
| 10/23/2025 | BULD - Electrical Clearance | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01528
Permit Description: Remodel - TI
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2025 | COT - LCPL - Rough Soil | Passed | ||
| 10/28/2025 | COT - LCBU - Preslab | Passed | 10-28-25: plans call for no dowels. Okay for pour back. | |
| 10/29/2025 | COT - LCPL - Gas Pressure Test | Passed | ||
| 10/29/2025 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 10/29/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 10/30/2025 | COT - LCBU - Framing | Passed | Ok to insulate and sheet rock throughout | |
| 11/13/2025 | COT - BULD - SWG Clearance | Passed | SOUTHWEST GAS CLEARANCE: SWG | |
| 12/16/2025 | COT - LCME - Kitchen Hood | Passed | Grease duct system double,wrapped, Ok to hang duct system. | |
| 02/13/2026 | COT - FCON - Hood System - Final | Passed | Approved on 2/9/26 on permit TF-FCP-1225-01015 | |
| 02/13/2026 | COT - FCON - Fire - Final | Passed | ||
| 02/13/2026 | COT - LCPL - Plumbing Final | Passed | Passed 2/12/26 | |
| 02/13/2026 | COT - LCEL - Electrical Above Ceiling | Passed | Passed 2/12/26 | |
| 02/13/2026 | COT - LCME - Mechanical Above Ceiling | Passed | Passed 2/12/26 | |
| 02/13/2026 | COT - LCME - Mechanical Intermediate | Passed | Passed 2/12/26 | |
| 02/13/2026 | COT - LCPL - Gas Final | Passed | Passed 2/12/26 | |
| 02/19/2026 | ENGR Engineering Final | Passed | ||
| 02/19/2026 | TRSP - ROW - Final/Close-Out | Passed | Work completed outside of the right of way | |
| 02/26/2026 | COT - LCBU - Building Final | Passed | OK to make application,for Certificate of Occupancy to open business. | |
| 02/26/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 02/26/2026 | COT - LCME - Mechanical Final | Passed | ||
| 02/26/2026 | COT - LCEL - Electrical Final | Passed | ||
| 02/26/2026 | BULD - Electrical Clearance | Passed | No clearance required; service is active | |
| 02/26/2026 | COT - LCBU - Masonry Pregrout | Passed |