Permit: TC-COM-0824-01558
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2719 E BROADWAY BL
Address NEW:
2719 E BROADWAY BL
Apply Date:
08/09/2024
Applicant:
Description:
Interior remodel
Permit Reviews
Permit Number - TC-COM-0824-01558
Permit Status: Complete
Permit Description: Interior remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2024 | RESTAMP - COMMERCIAL v.2 | 09/12/2024 | APPROVED |
| 08/29/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 09/10/2024 | APPROVED |
| 09/11/2024 | RESTAMP - COMMERCIAL v.1 | 09/12/2024 | REQUIRES RESUBMIT |
| 08/09/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 08/27/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0824-01558
Permit Status: Complete
Permit Description: Interior remodel
| Date | Description | Comments |
|---|---|---|
| 08/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01558
Permite Description: Interior remodel
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 03/07/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | Stickers above exit doors shall be added "This door to remain unlocked while building is occupied." |
| 03/07/2025 | ENGR Engineering Final | N/A | Partial Pass | Allowed at this time for the coffee shop will be a TCO4 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01558
Permit Description: Interior remodel
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2024 | COT - HCPL - Plumbing Progress | Passed | Plumbing underground: interior plumbing waste lines. Ok to cover progress areas. | |
| 10/08/2024 | COT - HCBU - Framing | Passed | ||
| 10/16/2024 | BULD - Electrical Clearance | Passed | TEP INCR | |
| 10/24/2024 | COT - HCBU - Building Progress | Passed | ||
| 10/24/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 10/24/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 10/24/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 10/24/2024 | COT - HCPL - Plumbing Intermediate | Passed | Sewer connection to main sewer line. OK to back fill progress areas. | |
| 11/06/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 11/06/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 11/06/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 11/06/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 11/06/2024 | COT - HCME - Mechanical Progress | Passed | ||
| 03/07/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 03/07/2025 | COT - HCME - Mechanical Final | Passed | ||
| 03/07/2025 | COT - HCEL - Electrical Final | Passed | ||
| 03/07/2025 | COT - HCBU - Building Final | Passed | ||
| 03/07/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/13/2025 | COT - FCON - Fire - Final | Passed | ||
| 08/14/2025 | ENGR Engineering Final | Passed | Site in accordance with As-Built. |