Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | ENGR Engineering Final | Partial Pass | Allowed at this time for the coffee shop will be a TCO4 | |
| 08/14/2025 | ENGR Engineering Final | Passed | Site in accordance with As-Built. |