Permit Details

Status:
Issued
Type:
Commercial Building
Address:
1109 W GLENN ST
Address NEW:
1109 W GLENN ST
Apply Date:
08/29/2023
Applicant:
Description:
Industrial office/warehouse/maintenance shop.

Permit Reviews

Permit Number - TC-COM-0823-02101
Permit Status: Issued
Permit Description: Industrial office/warehouse/maintenance shop.
Start Date Submittal Complete Date Status  
06/05/2024 COMMERCIAL REVIEW - FULL v.2 06/11/2024 APPROVED Review Details
10/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 10/27/2025 APPROVED Review Details
06/11/2024 RESTAMP - COMMERCIAL v.1 06/11/2024 APPROVED Review Details
08/31/2023 COMMERCIAL REVIEW - FULL v.1 10/02/2023 REQUIRES RESUBMIT Review Details
01/05/2024 COMMERCIAL REVIEW - FULL v.2 02/01/2024 REQUIRES RESUBMIT Review Details
02/07/2024 COMMERCIAL REVIEW - FULL v.3 03/19/2024 APPROVED Review Details
05/08/2024 COMMERCIAL REVIEW - FULL v.1 06/05/2024 REQUIRES RESUBMIT Review Details
03/19/2024 RESTAMP - COMMERCIAL v.1 03/20/2024 APPROVED Review Details
05/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/09/2025 REQUIRES RESUBMIT Review Details
07/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/31/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0823-02101
Permit Status: Issued
Permit Description: Industrial office/warehouse/maintenance shop.
Total Outstanding Activity Conditions - 1
Date Name
07/18/2024 Prior to project being finalized applicant must provide REPLACE THIS SECTION WITH THE REQUIRED DOCUMENT(S).

Conditions

Permit Number - TC-COM-0823-02101
Permit Status: Issued
Permit Description: Industrial office/warehouse/maintenance shop.
Date Description Comments
07/18/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
08/31/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/18/2024 Masonry Inspection Report submittal review is required.
07/18/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
08/31/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/07/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/18/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0823-02101
Permite Description: Industrial office/warehouse/maintenance shop.
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
09/27/2024 COT - HCPL - Sewer N/A Partial Pass Sewer line (4”) from property line to main sewer connection in street: approximately 50’. Ok to cover progress areas. Will reschedule when line is completed. Electric underground: 2 light pole caissons at far West side of property and trench for future cameras. Ok to cover trenching and place concrete in caissons. Framing: interior steel stairs are in place to upper level.
11/26/2024 COT - HCBU - Framing N/A Partial Pass
11/14/2024 COT - HCPL - Plumbing Above Ceiling N/A Not Ready
11/14/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass Partial pass. 1st floor in walls. Office 1, bathroom, office 2, office 3, open office A, office 4, reception area, open office. Okay to proceed progress areas. Pending reception des areas. 11/14/2024
03/17/2025 COT - BULD - SWG Clearance N/A Not Applicable
11/26/2024 BULD - Electrical Clearance N/A Not Ready
09/25/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Partial approval for 12 lightbulb bases starting at entrance off of Glenn heading south and then west into the yard OK to place concrete,
Partial approval for interior second deck weldment and fastener replacement OK to proceed
11/05/2024 COT - HCEL - Electrical Progress N/A Partial Pass
12/11/2024 COT - HCPL - Plumbing Progress N/A Partial Pass Partial pass. Domestic water lines throughout building on test and approved. 12/11/2024
04/21/2025 COT - FCON - Fire - Final N/A Not Ready Need address on building,
04/25/2025 ENGR Engineering Final N/A Not Ready Building needs address numbers before engineering final can be completed.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0823-02101
Permit Description: Industrial office/warehouse/maintenance shop.
Total Completed Inspections - 30
Date Description Inspector Results Comments
04/19/2024 COT - HCPL - Rough Soil Passed All underground plumbing in slab per plan and approved. Okay to backfill. Shading is required. 4/19/2024
07/18/2024 COT - HCBU - Preslab Passed
09/25/2024 COT - HCBU - Roof Nailing Passed
09/25/2024 COT - HCBU - Exterior Clips/Sheathing Passed
10/07/2024 COT - HCPL - Sewer Passed
10/07/2024 COT - HCEL - Electrical Underground Passed
11/27/2024 COT - HCME - Mechanical Above Ceiling Passed
02/03/2025 COT - HCEL - Electrical Above Ceiling Passed
03/14/2025 COT - HCBU - Framing Passed
03/14/2025 COT - HCPL - Plumbing Above Ceiling Passed
03/14/2025 COT - HCEL - Electrical Intermediate Passed
03/17/2025 COT - HCBU - Building Progress Passed
04/02/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/2/2025
04/02/2025 COT - HCEL - Outdoor Lighting Passed 4/2/2025 approved.
04/02/2025 COT - HCBU - Building Above Ceiling Passed
04/03/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
04/03/2025 COT - HCEL - Electrical Progress Passed
04/03/2025 COT - HCPL - Plumbing Progress Passed
04/03/2025 COT - HCME - Mechanical Intermediate Passed
04/03/2025 COT - HCME - Mechanical Progress Passed
04/03/2025 COT - HCPL - Plumbing Intermediate Passed
04/17/2025 TRSP - ROW - Final/Close-Out Passed
04/25/2025 COT - HCME - Mechanical Final Passed
04/25/2025 COT - HCEL - Electrical Final Passed
04/25/2025 COT - HCPL - Plumbing Final Passed
05/01/2025 COT - HCBU - TCO Passed
05/01/2025 COT - HCBU - Building Final Passed
05/06/2025 COT - FCON - Fire - Final Passed
05/06/2025 COT - HCBU - CofO Passed
05/07/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
AIR BALANCE RPEORT.TWC TUCSON - REV 1_V3_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-22016-TWC TUCSON-PLANSET-REV4_V2_V1.PDF DOCUMENTS VIEW
22016-SPECIAL_INSPECTION_CERTIFICATE-2023-08-29_V1.PDF DOCUMENTS VIEW
22016-TWC TUCSON STRUCTURAL DELTA 3 SUPPLEMENTAL CALCS_V1.PDF DOCUMENTS VIEW
CONS-22016-TWC TUCSON-PLANSET-REV4_V2.PDF DOCUMENTS VIEW
CONS-22016-TWC-TUCSON-PLANSET-REV2_V3.PDF DOCUMENTS VIEW