Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 05/10/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Pre-slab: rebar (#4) and 2 ufers are in place. Footings and column footings; plumbing pre-slab. Ensure slab area is properly termite treated. Ok to,place concrete in progress areas. | |
| 09/05/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Interior column pour-backs (7); changes as per ASI #1 & #2. Dry packed and epoxied bolts (special inspected). Ok to place concrete in progress areas. | |
| 09/25/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial approval for 12 lightbulb bases starting at entrance off of Glenn heading south and then west into the yard OK to place concrete, Partial approval for interior second deck weldment and fastener replacement OK to proceed |