Permit: TC-COM-0823-02100
Permit Details
Apply Date:
08/29/2023
Applicant:
Brandy Burke
Description:
New ground up construction of Salad and Go restaurant with drive thru and dumpster enclosure
Permit Reviews
Permit Number - TC-COM-0823-02100
Permit Status: Complete
Permit Description: New ground up construction of Salad and Go restaurant with drive thru and dumpster enclosure
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/01/2024 | COMMERCIAL REVIEW - FULL v.3 | 03/01/2024 | APPROVED |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | REQUIRES RESUBMIT |
08/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/05/2024 | APPROVED |
03/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/21/2024 | APPROVED |
01/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/08/2025 | APPROVED |
08/31/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/02/2023 | REQUIRES RESUBMIT |
03/01/2024 | RESTAMP - COMMERCIAL v.1 | 03/11/2024 | APPROVED |
08/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/16/2024 | APPROVED |
01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/07/2025 | APPROVED |
10/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/30/2024 | APPROVED |
10/16/2023 | COMMERCIAL REVIEW - FULL v.2 | 11/06/2023 | REQUIRES RESUBMIT |
10/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/23/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0823-02100
Permit Status: Complete
Permit Description: New ground up construction of Salad and Go restaurant with drive thru and dumpster enclosure
Date | Description | Comments |
---|---|---|
04/10/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
04/10/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/31/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
04/10/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
03/21/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
04/10/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/10/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
04/10/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
10/29/2024 | Masonry Inspection Report submittal review is required. | |
04/10/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
08/31/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/10/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
10/29/2024 | canopy - SPECIAL INSPECTION FOR STEEL FRAMES IS REQUIRED. | |
04/10/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
04/10/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02100
Permite Description: New ground up construction of Salad and Go restaurant with drive thru and dumpster enclosure
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
05/03/2024 | COT - HCPL - Gas Final | N/A | Not Applicable | |
06/06/2024 | COT - HCEL - Electrical Underground | N/A | Not Ready | 6/6/24: not ready |
06/05/2024 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | Wanted UG electric. |
06/06/2024 | COT - HCPL - Plumbing Roof Drains | N/A | Not Ready | 6/6/24: not ready |
06/14/2024 | COT - HCBU - Building Above Ceiling | N/A | Not Applicable | |
05/29/2024 | COT - HCBU - Framing | N/A | Partial Pass | Roof nailing. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02100
Permit Description: New ground up construction of Salad and Go restaurant with drive thru and dumpster enclosure
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, footings are properly dug and clean of debris, vapor barrier is installed, rebar reinforcement is in place and supported off of ground, plumbing pipes are properly wrapped with foam, and Ufer ground is connected to 20' of rebar reinforcement in the bottom of the footing. Okay to pour concrete footings and slab on grade. | |
05/13/2024 | COT - HCBU - Preslab | Passed | Concrete forms are set, footings are properly dug and clean of debris, vapor barrier is installed, rebar reinforcement is in place and supported off of ground, plumbing pipes are properly wrapped with foam, and Ufer ground is connected to 20' of rebar reinforcement in the bottom of the footing. Okay to pour concrete footings and slab on grade. | |
05/13/2024 | COT - HCEL - Grounding/Bonding | Passed | Concrete forms are set, footings are properly dug and clean of debris, vapor barrier is installed, rebar reinforcement is in place and supported off of ground, plumbing pipes are properly wrapped with foam, and Ufer ground is connected to 20' of rebar reinforcement in the bottom of the footing. Okay to pour concrete footings and slab on grade. | |
05/17/2024 | COT - HCPL - Rough Soil | Passed | 5/17/24: grease interceptor installed and under test okay to backfill | |
05/20/2024 | COT - HCPL - Yard Water Line | Passed | Inspection to include 4” sewer line from,building to main sewer line. Ok to cover progress area. Domestic water line from building to main water entry to site. Ok to cover progress areas. | |
05/20/2024 | COT - HCPL - Sewer | Passed | ||
05/31/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
06/10/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
06/11/2024 | COT - HCEL - Electrical Underground | Passed | ||
06/12/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
06/12/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
06/12/2024 | COT - HCPL - Plumbing Roof Drains | Passed | ||
06/12/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
06/12/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
06/14/2024 | COT - HCBU - Framing | Passed | ||
07/16/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
07/16/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/08/2024 | COT - HCPL - Plumbing Final | Passed | Bacteria test results have been forwarded. | |
08/08/2024 | COT - HCME - Mechanical Final | Passed | ||
08/08/2024 | COT - HCEL - Electrical Final | Passed | ||
08/08/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
08/08/2024 | BULD - Electrical Clearance | Passed | No clearance required. Site is under power. | |
08/22/2024 | COT - FCON - Fire - Final | Passed | ||
11/26/2024 | ENGR Engineering Final | Passed | ||
11/26/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
11/26/2024 | COT - HCBU - Building Final | Passed |