Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Fees Paid
Type:
Commercial Building
Address NEW:
802 E UNIVERSITY BL
Apply Date:
07/17/2026
Applicant:
Kevin Kerpan
Description:
Remodel Interior for new tenant - Better Buzz Coffee.

Permit Reviews

Permit Number - TC-COM-0726-01127
Permit Status: Fees paid
Permit Description: Remodel Interior for new tenant - Better Buzz Coffee.
Start Date Submittal Complete Date Status  
07/23/2026 COMMERCIAL REVIEW - FULL v.1 08/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0726-01127
Permit Status: Fees paid
Permit Description: Remodel Interior for new tenant - Better Buzz Coffee.
Total Outstanding Activity Conditions - 11
Date Name
07/23/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/12/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
08/12/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF CONCRETE FOUNDATIONS IS REQUIRED. 1. INSPECTION OF IN-PLACE REINFORCING IN WALL & FOUNDATIONS PRIOR TO THE PLACEMENT OF CONCRETE. 2. NO CONCRETE INSPECTION & TESTING OF SPECIMENS IS REQUIRED FOR FOUNDATION CONCRETE (FOUNDATION DESIGN IS BASED ON f'c = 2,500 PSI). 3. NO CONCRETE INSPECTION IS REQUIRED FOR SLAB ON GRADE CONCRETE.
08/12/2026 Prior to Final - Required Documents - COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
08/12/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
08/12/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
08/12/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR STEEL REINFORCING IS REQUIRED.
08/12/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED.
08/13/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/13/2026 Prior to Issuance - Special Inspections - Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
08/13/2026 WATER STERILIZATION REPORT IS REQUIRED.