Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
5570 E TRAVEL PLAZA WY
Apply Date:
07/29/2025
Applicant:
bryan cimarusti
Description:
NEW ELECTRIC VEHICLE CHARGING STATION SYSTEM IS LOCATED IN THE PARKING LOT OF A PILOT FLYING J AREA OF DISTURBANCE= 1,600 S.F. 2 DISPENSERS 4 EVCS STALLS

Permit Reviews

Permit Number - TC-COM-0725-01427
Permit Status: Complete
Permit Description: NEW ELECTRIC VEHICLE CHARGING STATION SYSTEM IS LOCATED IN THE PARKING LOT OF A PILOT FLYING J AREA OF DISTURBANCE= 1,600 S.F. 2 DISPENSERS 4 EVCS STALLS
Start Date Submittal Complete Date Status  
01/16/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/21/2026 APPROVED Review Details
08/04/2025 COMMERCIAL REVIEW - FULL v.2 08/26/2025 REQUIRES RESUBMIT Review Details
08/01/2025 COMMERCIAL REVIEW - FULL v.1 08/01/2025 REQUIRES RESUBMIT Review Details
06/26/2026 SPECIAL INSPECTION REVIEW v.1 06/29/2026 APPROVED Review Details
01/05/2026 ADMINISTRATIVE v.1 01/05/2026 REQUIRES RESUBMIT Review Details
12/01/2025 COMMERCIAL REVIEW - FULL v.3 01/05/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0725-01427
Permit Status: Complete
Permit Description: NEW ELECTRIC VEHICLE CHARGING STATION SYSTEM IS LOCATED IN THE PARKING LOT OF A PILOT FLYING J AREA OF DISTURBANCE= 1,600 S.F. 2 DISPENSERS 4 EVCS STALLS
Date Description Comments
01/05/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/01/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/29/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/01/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/29/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/05/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0725-01427
Permite Description: NEW ELECTRIC VEHICLE CHARGING STATION SYSTEM IS LOCATED IN THE PARKING LOT OF A PILOT FLYING J AREA OF DISTURBANCE= 1,600 S.F. 2 DISPENSERS 4 EVCS STALLS
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/24/2026 COT - LCBU - Framing N/A Not Applicable 2-24-26: not applicable
03/03/2026 COT - BULD - SWG Clearance N/A Not Applicable
03/03/2026 COT - LCBU - Preslab N/A Partial Pass
06/26/2026 COT - LCPL - Sewer N/A Not Applicable 6-26-26: previous notes were intended for a separate permit at the "Tire Mart". This permit did not involve any new construction to sewer.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0725-01427
Permit Description: NEW ELECTRIC VEHICLE CHARGING STATION SYSTEM IS LOCATED IN THE PARKING LOT OF A PILOT FLYING J AREA OF DISTURBANCE= 1,600 S.F. 2 DISPENSERS 4 EVCS STALLS
Total Completed Inspections - 11
Date Description Inspector Results Comments
06/22/2026 BULD - Electrical Clearance Passed 6-22-26: okay to meter Switchboard-EV. ECO clearance issued to TEP.
06/26/2026 COT - LCBU - Building Final Passed 6-26-26: building final approved.
06/26/2026 COT - LCEL - Electrical Final Passed 6-26-26: electrical final approved.
06/26/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
06/26/2026 TRSP - ROW - Final/Close-Out Passed charger installation completed, no impact to right of way easement
06/26/2026 COT - LCEL - Grounding/Bonding Passed 6-26-26: grounding/bonding approved.
06/26/2026 COT - LCEL - Outdoor Lighting Passed 6-26-26: outdoor lighting approved.
06/26/2026 COT - LCBU - Preslab Passed 6-26-26: previously inspected & approved.
06/26/2026 COT - LCEL - Electrical Intermediate Passed 6-26-26: electrical intermediate approved.
06/26/2026 COT - LCEL - Electrical Underground Passed 6-26-26: electrical underground approved.
06/26/2026 COT - LCBU - Excavation/Rebar/Zoning Passed 6-26-26: previously inspected & approved.