Permit: TC-COM-0725-01347
Permit Details
Apply Date:
07/11/2025
Applicant:
Andrew Diller
Description:
new commercial building for Mister Car wash
Permit Reviews
Permit Number - TC-COM-0725-01347
Permit Status: Approved
Permit Description: new commercial building for Mister Car wash
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/16/2025 | REQUIRES RESUBMIT |
| 09/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/14/2026 | APPROVED |
| 08/17/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/21/2026 | REQUIRES RESUBMIT |
| 10/07/2025 | COMMERCIAL REVIEW - FULL v.4 | 10/28/2025 | REQUIRES RESUBMIT |
| 01/07/2026 | COMMERCIAL REVIEW - FULL v.6 | 01/23/2026 | APPROVED |
| 09/03/2025 | COMMERCIAL REVIEW - FULL v.3 | 09/26/2025 | REQUIRES RESUBMIT |
| 10/27/2026 | SPECIAL INSPECTION REVIEW v.1 | 10/29/2026 | APPROVED |
| 10/08/2026 | SPECIAL INSPECTION REVIEW v.5 | 10/12/2026 | APPROVED |
| 08/27/2026 | SPECIAL INSPECTION REVIEW v.2 | 08/28/2026 | REQUIRES RESUBMIT |
| 04/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/06/2026 | APPROVED |
| 09/08/2026 | SPECIAL INSPECTION REVIEW v.3 | 09/09/2026 | REQUIRES RESUBMIT |
| 05/04/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 05/15/2026 | APPROVED |
| 05/20/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 05/26/2026 | APPROVED |
| 09/14/2026 | SPECIAL INSPECTION REVIEW v.4 | 09/21/2026 | REQUIRES RESUBMIT |
| 02/09/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/09/2026 | REQUIRES RESUBMIT |
| 10/29/2025 | COMMERCIAL REVIEW - FULL v.5 | 11/18/2025 | REQUIRES RESUBMIT |
| 07/17/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/12/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0725-01347
Permit Status: Approved
Permit Description: new commercial building for Mister Car wash
| Date | Description | Comments |
|---|---|---|
| 11/18/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/11/2025 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. | |
| 07/16/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/11/2025 | SPECIAL INSPECTION OF EIFS IS REQUIRED. | |
| 08/28/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/11/2025 | SPECIAL INSPECTION OF MASONRY CONSTRUCTION IS REQUIRED. | |
| 09/16/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 09/25/2025 | An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 07/16/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/11/2025 | SPECIAL INSPECTION OF SOILS IS REQUIRED. | |
| 07/16/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 08/12/2025 | SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. | |
| 04/02/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 10/14/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Approved
Permit Number: TC-COM-0725-01347
Permite Description: new commercial building for Mister Car wash
Total Outstanding Inspections - 16
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | |
| 04/21/2026 | COT - LCBU - Masonry Pregrout | N/A | Partial Pass | 2nd lift. |
| 03/12/2026 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | Sanitary to tie in. |
| 05/06/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | Mechanical Room East and North walls. |
| 05/15/2026 | COT - LCBU - Framing | N/A | Partial Pass | walls |
| 05/15/2026 | COT - LCBU - Roof Nailing | N/A | Partial Pass | main roof; towers remian to be inspected. |
| 06/10/2026 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable | |
| 03/12/2026 | COT - HCEL - Electrical Underground | N/A | Partial Pass | East side |
| 03/12/2026 | COT - LCEL - Electrical Underground | N/A | Partial Pass | East side |
| 04/07/2026 | COT - LCBU - Preslab | N/A | Partial Pass | 4/7/26: Pre-slab approved at office area only. Ok to proceed with concrete placement |
| 09/10/2026 | ENGR Engineering Final | N/A | Partial Pass | Okay to apply for level 4 TCO |
| 09/08/2026 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | All field work complete; need to clear conditions. |
| 09/08/2026 | COT - LCME - Mechanical Final | N/A | Re-inspection required | All field work complete; need to clear conditions. |
| 09/08/2026 | COT - LCEL - Electrical Final | N/A | Re-inspection required | All field work complete; need to clear conditions. |
| 09/08/2026 | COT - LCBU - Building Final | N/A | Re-inspection required | All field work complete; need to clear conditions. |
| 09/11/2026 | COT - HCBU - TCO | N/A | Partial Pass | Level Four |
Completed Inspections
Permit Status: Approved
Permit Number: TC-COM-0725-01347
Permit Description: new commercial building for Mister Car wash
Total Completed Inspections - 23