Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2026 | COT - LCPL - Plumbing Final | Partial Pass | 9/3/26: Provide labels at the discount area and raceway supports, Install covers and WR-rated switches at the entry canopy, Adjust mirror height so that it does not exceed 40 inches, Provide the panel schedule in the manager’s office, Provide GFCI protection at all wet/damp locations as required, Install cover plates on all junction boxes (J-boxes) where required, Label all disconnect boxes, Repair or replace the dead receptacle located in the attic, Paint exterior PVC conduit to match the required finish, Secure the flexible electrical whip at the vacuum pump room on the roof, Replace undersized HVAC fuses with properly sized fuses in accordance with the equipment requirements, Properly install and secure the liquid-tight fitting at the rooftop exhaust connection, pending water sterilization report, okay to request extension of level 1 TCO |
|
| 09/08/2026 | COT - LCPL - Plumbing Final | Re-inspection required | All field work complete; need to clear conditions. |