Permit: TC-COM-0725-01297
Permit Details
Apply Date:
07/03/2025
Applicant:
Kelly Rehm
Description:
The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
Permit Reviews
Permit Number - TC-COM-0725-01297
Permit Status: Complete
Permit Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/28/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0725-01297
Permit Status: Complete
Permit Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
| Date | Description | Comments |
|---|---|---|
| 07/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0725-01297
Permite Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2025 | COT - CSOL - Electrical Underground Solar Project | N/A | Partial Pass | Building E to D |
| 02/19/2026 | COT - LCBU - Framing | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0725-01297
Permit Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2026 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 02/19/2026 | COT - LCBU - Building Final | Passed | ||
| 02/19/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/19/2026 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 02/19/2026 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 02/19/2026 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 02/20/2026 | BULD - Electrical Clearance | Passed | DGC TEP |