Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2026 | BULD - Electrical Clearance | Passed | 01/30/2026 Clearance TEP DGL at 1:25pm for 400A PV disconnect with (3)300A fuses. The PV system consists of 354 modules mounted across six commercial buildings. |
|
| 02/20/2026 | BULD - Electrical Clearance | Passed | DGC TEP |