Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
5943 E SPEEDWAY BL
Apply Date:
07/08/2024
Applicant:
burak bekat
Description:
RENOVATION TO EXISTING COMMERICAL BUILDING TO SUPPORT PADEL AND PICKLEBALL COURTS, INCLUDING OFFICES, WAITING AREA AND RESTROOMS.

Permit Reviews

Permit Number - TC-COM-0724-01322
Permit Status: Complete
Permit Description: RENOVATION TO EXISTING COMMERICAL BUILDING TO SUPPORT PADEL AND PICKLEBALL COURTS, INCLUDING OFFICES, WAITING AREA AND RESTROOMS.
Start Date Submittal Complete Date Status  
03/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2025 APPROVED Review Details
07/11/2024 COMMERCIAL REVIEW - FULL v.1 08/16/2024 REQUIRES RESUBMIT Review Details
03/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/12/2025 APPROVED Review Details
09/09/2024 COMMERCIAL REVIEW - FULL v.2 09/16/2024 APPROVED Review Details
09/16/2024 RESTAMP - COMMERCIAL v.1 09/19/2024 APPROVED Review Details
03/26/2025 COMMERCIAL REVIEW - FULL v.1 03/26/2025 REQUIRES RESUBMIT Review Details
12/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0724-01322
Permit Status: Complete
Permit Description: RENOVATION TO EXISTING COMMERICAL BUILDING TO SUPPORT PADEL AND PICKLEBALL COURTS, INCLUDING OFFICES, WAITING AREA AND RESTROOMS.
Date Description Comments
03/17/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/19/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/11/2024 Padel Court Designs must be submitted and approved prior to ...
03/17/2025 Post-Installed Anchor Inspection Report is required.
03/17/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/17/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/17/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0724-01322
Permite Description: RENOVATION TO EXISTING COMMERICAL BUILDING TO SUPPORT PADEL AND PICKLEBALL COURTS, INCLUDING OFFICES, WAITING AREA AND RESTROOMS.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/23/2024 COT - HCME - Mechanical Intermediate N/A Not Ready Wanted multiple inspections added to permit.
02/25/2025 COT - LCEL - Outdoor Lighting N/A Not Ready Builder had questions about procedures; no pre-con inspection.
03/12/2025 COT - FCON - Fire - Final N/A Re-inspection required Exiting, occupancy type and load issues. Ok for TCO level 3

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0724-01322
Permit Description: RENOVATION TO EXISTING COMMERICAL BUILDING TO SUPPORT PADEL AND PICKLEBALL COURTS, INCLUDING OFFICES, WAITING AREA AND RESTROOMS.
Total Completed Inspections - 23
Date Description Inspector Results Comments
12/23/2024 COT - HCPL - Rough Soil Passed
01/08/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
01/23/2025 COT - HCBU - Exterior Clips/Sheathing Passed
01/23/2025 COT - HCBU - Roof Nailing Passed
01/23/2025 COT - HCBU - Framing Passed
01/23/2025 COT - HCBU - Preslab Passed
01/30/2025 COT - HCEL - Electrical Intermediate Passed
02/04/2025 BULD - Electrical Clearance Passed INCR; no meter at this time.
02/04/2025 COT - LCEL - Electrical Underground Passed
02/06/2025 COT - HCME - Mechanical Intermediate Passed
02/19/2025 COT - LCEL - Grounding/Bonding Passed
02/19/2025 COT - LCEL - Electrical Above Ceiling Passed
02/19/2025 COT - LCEL - Electrical Intermediate Passed
02/19/2025 COT - LCEL - Electrical Progress Passed
02/19/2025 COT - HCPL - Plumbing Intermediate Passed
02/19/2025 COT - BULD - SWG Clearance Passed
02/25/2025 TRSP - ROW - Final/Close-Out Passed
03/07/2025 COT - LCPL - Plumbing Final Passed 3-7-25, plumbing final approved.
03/07/2025 COT - LCEL - Electrical Final Passed 3-7-25, electrical final approved.
03/11/2025 COT - LCBU - Building Final Passed
03/12/2025 COT - LCME - Mechanical Final Passed
03/12/2025 ENGR Engineering Final Passed Contractor continues to work on the landscaping needs to connect the irrigation line. Control pan
Over here, yeah I have
Hands and knees contractor and ask I could came back for re inspection pass the landscaping.
03/12/2025 COT - LCEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
25C0218_1 TURNER 03 11 2025 0825-2025-03-13_V1.PDF DOCUMENTS VIEW
608582001 SI CLOSE OUT PACKAGE, FINAL-2025-03-13_V1.PDF DOCUMENTS VIEW
PADEL SPORTS COMPLEX TAB REPORT_V1.PDF DOCUMENTS VIEW
23152-DEFERRED_SUBMITTAL-COURT_INFORMATION_V1.PDF DOCUMENTS VIEW
23152-DEFERRED_SUBMITTAL-STRUCTURAL_CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-23152-PADEL_ON_SPEEDWAY-SECOND_SUBMITTAL_SET_V2_V1.PDF DOCUMENTS VIEW