Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | ENGR Engineering Final | Partial Pass | Contractors good for a level three TCO. Need to complete the landscaping in the back with DG and plants. Also need to sign address for the building. | |
| 03/07/2025 | ENGR Engineering Final | Not Ready | Not ready at this time for a TCO of any kind | |
| 03/12/2025 | ENGR Engineering Final | Passed | Contractor continues to work on the landscaping needs to connect the irrigation line. Control pan Over here, yeah I have Hands and knees contractor and ask I could came back for re inspection pass the landscaping. |