Permit: TC-COM-0723-01703
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
4795 S CONTRACTORS WY
Address NEW:
4795 S CONTRACTORS WY
Apply Date:
07/13/2023
Applicant:
Carrie Cote
Description:
Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Permit Reviews
Permit Number - TC-COM-0723-01703
Permit Status: Issued
Permit Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/14/2023 | APPROVED |
| 06/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/11/2024 | APPROVED |
| 09/14/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/03/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0723-01703
Permit Status: Issued
Permit Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
| Date | Description | Comments |
|---|---|---|
| 07/18/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/14/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 07/18/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 07/18/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 07/18/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 07/18/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0723-01703
Permite Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/01/2023 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Partial underground electrical conduits from the control building out to the pump location, the hydro tank location and future the generator location, okay to backfill progress areas Partial 1/0 cu Ufer ground at the control building, and extending to the other locations, okay to backfill progress areas |
| 10/30/2023 | COT - HCEL - Electrical Progress | N/A | Canceled | |
| 11/20/2023 | COT - HCBU - Building Progress | N/A | Not Ready | 11/20/23: workers still working on the block for the first lift. Please walk your job for QC before the inspection is scheduled to ensure it is ready for inspection. |
| 11/08/2023 | BULD - Electrical Clearance | N/A | Scheduled | Per Superintendent Noe Mejia, the current electrical is temporary power, once building is complete then panel and meter box will be moved to this location. Not ready at this time. |
| 11/20/2023 | COT - HCBU - Framing | N/A | Not Ready | 11/20/23: workers still working on the block for the first lift. Please walk your job for QC before the inspection is scheduled to ensure it is ready for inspection.This in not a framing inspection, is is a masonry pre grout inspection. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0723-01703
Permit Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/08/2023 | COT - HCBU - Preslab | Passed | Rebar reinforcement is in place per plans on pump house and electrical room. Okay to proceed with pour after 3rd party inspection is passed. | |
| 11/08/2023 | COT - HCEL - Grounding/Bonding | Passed | 11/8/23: 1/0 cu Ufer ground is connected on electric room and control room rebar reinforcement. Okay to pour concrete for slabs. | |
| 11/08/2023 | COT - HCEL - Electrical Underground | Passed | 11/8/23: underground electrical conduits are complete. Okay to pour concrete slab. | |
| 11/08/2023 | COT - HCEL - Electrical Progress | Passed | Electrical underground is complete to electric room above slab. | |
| 01/03/2024 | COT - HCBU - Building Progress | Passed | ||
| 03/07/2024 | BULD - Electrical Clearance | Passed | ||
| 03/07/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 06/06/2024 | ENGR Engineering Final | Passed | ||
| 06/13/2024 | COT - HCBU - Building Final | Passed | ||
| 06/13/2024 | COT - HCBU - CofO | Passed | ||
| 06/13/2024 | COT - HCBU - Framing | Passed | ||
| 06/13/2024 | COT - HCEL - Electrical Final | Passed | ||
| 06/13/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 06/13/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 06/13/2024 | COT - HCPL - Plumbing Progress | Passed |
Scheduled Inspections
Scheduled Inspections - TC-COM-0723-01703
Status: Issued
Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 11/09/2023 | BULD - Electrical Clearance | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.