Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
4795 S CONTRACTORS WY
Apply Date:
07/13/2023
Applicant:
Carrie Cote
Description:
Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical

Permit Reviews

Permit Number - TC-COM-0723-01703
Permit Status: Issued
Permit Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Start Date Submittal Complete Date Status  
07/14/2023 COMMERCIAL REVIEW - FULL v.1 08/14/2023 APPROVED Review Details
06/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/11/2024 APPROVED Review Details
09/14/2023 COMMERCIAL REVIEW - FULL v.1 10/03/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0723-01703
Permit Status: Issued
Permit Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Date Description Comments
07/18/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/14/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
07/18/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/18/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/18/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
07/18/2023 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0723-01703
Permite Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/01/2023 COT - BULD - SWG Clearance N/A Not Applicable
11/01/2023 COT - HCEL - Grounding/Bonding N/A Partial Pass Partial underground electrical conduits from the control building out to the pump location, the hydro tank location and future the generator location, okay to backfill progress areas
Partial 1/0 cu Ufer ground at the control building, and extending to the other locations, okay to backfill progress areas
10/30/2023 COT - HCEL - Electrical Progress N/A Canceled
11/20/2023 COT - HCBU - Building Progress N/A Not Ready 11/20/23: workers still working on the block for the first lift. Please walk your job for QC before the inspection is scheduled to ensure it is ready for inspection.
11/08/2023 BULD - Electrical Clearance N/A Scheduled Per Superintendent Noe Mejia, the current electrical is temporary power, once building is complete then panel and meter box will be moved to this location. Not ready at this time.
11/20/2023 COT - HCBU - Framing N/A Not Ready 11/20/23: workers still working on the block for the first lift. Please walk your job for QC before the inspection is scheduled to ensure it is ready for inspection.This in not a framing inspection, is is a masonry pre grout inspection.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0723-01703
Permit Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Total Completed Inspections - 16
Date Description Inspector Results Comments
10/26/2023 TRSP - ROW - Final/Close-Out Passed
11/08/2023 COT - HCBU - Preslab Passed Rebar reinforcement is in place per plans on pump house and electrical room. Okay to proceed with pour after 3rd party inspection is passed.
11/08/2023 COT - HCEL - Grounding/Bonding Passed 11/8/23: 1/0 cu Ufer ground is connected on electric room and control room rebar reinforcement. Okay to pour concrete for slabs.
11/08/2023 COT - HCEL - Electrical Underground Passed 11/8/23: underground electrical conduits are complete. Okay to pour concrete slab.
11/08/2023 COT - HCEL - Electrical Progress Passed Electrical underground is complete to electric room above slab.
01/03/2024 COT - HCBU - Building Progress Passed
03/07/2024 BULD - Electrical Clearance Passed
03/07/2024 COT - HCEL - Electrical Intermediate Passed
06/06/2024 ENGR Engineering Final Passed
06/13/2024 COT - HCBU - Building Final Passed
06/13/2024 COT - HCBU - CofO Passed
06/13/2024 COT - HCBU - Framing Passed
06/13/2024 COT - HCEL - Electrical Final Passed
06/13/2024 COT - HCPL - Plumbing Final Passed
06/13/2024 COT - HCPL - Plumbing Intermediate Passed
06/13/2024 COT - HCPL - Plumbing Progress Passed

Scheduled Inspections

Scheduled Inspections - TC-COM-0723-01703
Status: Issued
Description: Sundt Booster Station Upgrades-replace existing equipment with new pump station & related piping, control building, electrical
Scheduled Date Description Entered By Entered Date
11/09/2023 BULD - Electrical Clearance Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
SPECIAL INSPECTION CERTIFICATE-2024-06-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-R1 SUNDT BSTR REVISION 1_SIGNED 8-9-23_3_V1.PDF DOCUMENTS VIEW
R1 SUNDTC-D.SAECOGEOREPORT_V1.PDF DOCUMENTS VIEW
R1-SUNDT BSTR BLDG PERMIT REVISION 1 9-14-23-SIGNED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1-2018 IBC TW STANDARD CALCS - 15X15 CONTROL BLDG_V1.PDF DOCUMENTS VIEW
1-2018 TW STANDARD CALCS- RADIO ANTENNA MAST FNDN_V1.PDF DOCUMENTS VIEW
1-2020 TW STANDARD CALCS- DETACHABLE CANOPY_V1.PDF DOCUMENTS VIEW
1-SUNDT BSTR BLDG PERMIT TRANS 7-13-23-SIGNED_V1.PDF DOCUMENTS VIEW
1-SUNDT BSTR PAD STRUCT CALCS-FINAL_V1.PDF DOCUMENTS VIEW
1-SUNDT BSTR UPGR FINAL SPECS-SEALED 7-10-23_V1.PDF DOCUMENTS VIEW
CONS-1-SUNDT BSTR UPGR FINAL PLANS-SEALED 7-10-23_V1.PDF DOCUMENTS VIEW