Inspection History Details
Inspection Status: Not Applicable
Inspection History: COT - HCEL - Grounding/Bonding
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2023 | COT - HCEL - Grounding/Bonding | Not Applicable | ||
| 11/01/2023 | COT - HCEL - Grounding/Bonding | Partial Pass | Partial underground electrical conduits from the control building out to the pump location, the hydro tank location and future the generator location, okay to backfill progress areas Partial 1/0 cu Ufer ground at the control building, and extending to the other locations, okay to backfill progress areas |
|
| 11/08/2023 | COT - HCEL - Grounding/Bonding | Passed | 11/8/23: 1/0 cu Ufer ground is connected on electric room and control room rebar reinforcement. Okay to pour concrete for slabs. |