Inspection History Details
Inspection Status: Canceled
Inspection History: COT - HCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2024 | COT - HCBU - Framing | Canceled | 11/20/23: workers still working on the block for the first lift. Please walk your job for QC before the inspection is scheduled to ensure it is ready for inspection.This in not a framing inspection, is is a masonry pre grout inspection. 6/6/24: canceled by Tyler |
|
| 06/13/2024 | COT - HCBU - Framing | Passed | ||
| 11/20/2023 | COT - HCBU - Framing | Not Ready | 11/20/23: workers still working on the block for the first lift. Please walk your job for QC before the inspection is scheduled to ensure it is ready for inspection.This in not a framing inspection, is is a masonry pre grout inspection. | |
| 12/20/2023 | COT - HCBU - Framing | Not Ready |