Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Commercial Building
Apply Date:
06/29/2026
Applicant:
Dan Kessler
Description:
ByFusion TI in existing shell building

Permit Reviews

Permit Number - TC-COM-0626-00977
Permit Status: In review
Permit Description: ByFusion TI in existing shell building
Start Date Submittal Complete Date Status  
10/07/2026 COMMERCIAL REVIEW - FULL v.3 N/A IN REVIEW Review Details
06/29/2026 COMMERCIAL REVIEW - FULL v.1 07/22/2026 REQUIRES RESUBMIT Review Details
09/03/2026 COMMERCIAL REVIEW - FULL v.2 09/29/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0626-00977
Permit Status: In review
Permit Description: ByFusion TI in existing shell building
Total Outstanding Activity Conditions - 8
Date Name
06/29/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/29/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/17/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF ADHESIVE ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS CONCRETE IS REQUIRED.
09/17/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION OF POST-TENSIONING OF VERTICAL THREADED RODS IS REQUIRED.
09/17/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
09/23/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
09/23/2026 Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
09/23/2026 WATER STERILIZATION REPORT IS REQUIRED.