Permit: TC-COM-0623-01588
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10071 E OLD VAIL RD
Address NEW:
10071 E OLD VAIL RD
Apply Date:
06/27/2023
Applicant:
Catherine Atchley
Description:
New construction Salad and Go drive-thru only restaurant/snack back with trash enclosure
Permit Reviews
Permit Number - TC-COM-0623-01588
Permit Status: Complete
Permit Description: New construction Salad and Go drive-thru only restaurant/snack back with trash enclosure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/29/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/27/2023 | REQUIRES RESUBMIT |
| 10/20/2023 | COMMERCIAL REVIEW - FULL v.4 | 11/07/2023 | REQUIRES RESUBMIT |
| 05/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/15/2024 | APPROVED |
| 08/15/2023 | COMMERCIAL REVIEW - FULL v.3 | 09/14/2023 | REQUIRES RESUBMIT |
| 11/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/06/2024 | APPROVED |
| 02/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/13/2024 | APPROVED |
| 11/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/26/2024 | APPROVED |
| 08/14/2023 | COMMERCIAL REVIEW - FULL v.2 | 08/14/2023 | REQUIRES RESUBMIT |
| 03/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/24/2025 | APPROVED |
| 05/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/07/2024 | REQUIRES RESUBMIT |
| 05/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/17/2024 | APPROVED |
| 01/05/2024 | COMMERCIAL REVIEW - FULL v.5 | 01/31/2024 | APPROVED |
| 01/31/2024 | RESTAMP - COMMERCIAL v.1 | 02/01/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0623-01588
Permit Status: Complete
Permit Description: New construction Salad and Go drive-thru only restaurant/snack back with trash enclosure
| Date | Description | Comments |
|---|---|---|
| 04/24/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/24/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 04/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/24/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/24/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 04/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/24/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 04/24/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment.. | |
| 04/24/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 01/09/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
| 04/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/24/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 04/24/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 04/24/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. | |
| 04/24/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01588
Permite Description: New construction Salad and Go drive-thru only restaurant/snack back with trash enclosure
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Re-inspection required | Ducts must be strapped and properly supported throughout. Cannot rest on pex lines and other mechanical equipment., registers and lighting fixtures must be strapped and secured by seismic wire, fire caulk needed at wall penetrations at bathroom, loose duct above ceiling wall dividing bathroom and refrigerator. |
| 04/08/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Re-inspection required | Ducts must be strapped and properly supported throughout. Cannot rest on pex lines and other mechanical equipment., registers and lighting fixtures must be strapped and secured by seismic wire, fire caulk needed at wall penetrations at bathroom, loose duct above ceiling wall dividing bathroom and refrigerator. |
| 05/14/2024 | COT - HCBU - Masonry Pregrout | N/A | Not Applicable | |
| 05/14/2024 | COT - HCBU - Sustainability | N/A | Not Applicable | |
| 05/14/2024 | COT - HCME - Venting | N/A | Not Applicable | |
| PDSD Heavy Commercial Building Division Pre-Construction Meeting | N/A | Requested | ||
| 05/14/2024 | BULD - Electrical Clearance | N/A | Not Applicable | Duplicate inspection |
| 04/25/2024 | COT - BULD - SWG Clearance | N/A | Not Ready | 2nd clearance inspection requested by TEP. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01588
Permit Description: New construction Salad and Go drive-thru only restaurant/snack back with trash enclosure
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/15/2024 | COT - HCPL - Sewer | Passed | ||
| 02/15/2024 | COT - HCPL - Yard Water Line | Passed | ||
| 02/16/2024 | COT - HCEL - Electrical Underground | Passed | ||
| 02/23/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
| 03/08/2024 | COT - HCBU - Framing | Passed | Exterior & Interior walls are properly framed, fire blocking is installed at the 8' level completely on all walls. Shear wall hold downs are installed and properly secured to sole plate and screwed to studs per manufacturer's specifications. | |
| 03/08/2024 | COT - HCBU - Roof Nailing | Passed | Roof is properly nailed down, H2.5 clips are properly installed on each rafters, truss calcs are onsite. Okay to proceed with roofing material application. | |
| 03/08/2024 | COT - HCBU - Interior Shear Bracing | Passed | Plywood for interior shear wall is properly installed and secured with nails per plans. | |
| 03/15/2024 | COT - HCPL - Plumbing Intermediate | Passed | 3/15/24: Plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 03/15/2024 | COT - HCME - Mechanical Intermediate | Passed | 3/15/24: Mechanical rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 03/15/2024 | COT - HCEL - Electrical Intermediate | Passed | 3/15/24: Electrical rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 03/15/2024 | COT - HCPL - Plumbing Roof Drains | Passed | Roof drains are complete and under a water test with no leaks. | |
| 03/20/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 04/08/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 04/10/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/10/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 04/10/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 04/22/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/07/2024 | COT - HCBU - Building Progress | Passed | ||
| 05/07/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 05/07/2024 | COT - FCON - Fire - Final | Passed | ||
| 05/10/2024 | COT - HCEL - Electrical Final | Passed | ||
| 05/10/2024 | COT - HCME - Mechanical Final | Passed | ||
| 05/13/2024 | COT - HCPL - Plumbing Final | Passed | 5/13/24: Missing faucets have been installed and are working properly. | |
| 05/14/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCEL - Electrical Progress | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCPL - Plumbing Progress | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCBU - Building Above Ceiling | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCPL - Rough Soil | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCBU - Building Final | Passed | ||
| 05/14/2024 | COT - HCBU - CofO | Passed | ||
| 05/14/2024 | COT - HCBU - Preslab | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCME - Mechanical Progress | Passed | Duplicate inspection | |
| 05/14/2024 | COT - HCBU - TCO | Passed | 5/14/24: level 4 TCO | |
| 10/30/2024 | ENGR Engineering Final | Passed | Landscape approved by David Roberts 10/03/2024. Last comments satisfied - Passed. JG |