Inspection Status: Re-inspection required
Inspection History: COT - HCME - Mechanical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 04/08/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Re-inspection required |
Ducts must be strapped and properly supported throughout. Cannot rest on pex lines and other mechanical equipment., registers and lighting fixtures must be strapped and secured by seismic wire, fire caulk needed at wall penetrations at bathroom, loose duct above ceiling wall dividing bathroom and refrigerator. |
| 04/09/2024 |
COT - HCME - Mechanical Above Ceiling |
|
Canceled |
4/9/24: canceled per contractor |
|
COT - HCME - Mechanical Above Ceiling |
|
Passed |
|